The Eastern North – South Expressway (Vinh Hao – Phan Thiet, Phan Thiet – Dau Giay), the Trung Luong – My Thuan Expressway and National Highways NH5, NH51, NH55 and NH56.
50 representative projects completed
No
Project Name
Project Owner
1
Survey and design consultancy for the Ho Tram – Long Thanh International Airport urban expressway project under the public-private partnership (PPP) model
Masterise Long Thanh – Ho Tram Expressway Infrastructure JSC (MAG)
2
Technical design consultancy for Km85+160-Km97+891 under the construction investment project to widen the Ho Chi Minh City – Trung Luong – My Thuan Expressway under the public-private partnership model
A2Z Construction Consultancy JSC
3
Survey, construction drawing design and building information modelling (BIM) consultancy, segment Km85+160 – Km92+370, Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City – Trung Luong – My Thuan Expressway under the public-private partnership model
Thanh Huy Group JSC
4
Survey, construction drawing design and building information modelling (BIM) consultancy, segment XL04 – Km92+370 – Km97+891,44 (including bridges), Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City – Trung Luong – My Thuan Expressway under the public-private partnership model
CII Infrastructure Construction JSC
5
Survey, construction drawing design and building information modelling (BIM) consultancy, segment XL04 – Km97+891,44 – 105 +454 (including bridges), Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City – Trung Luong – My Thuan Expressway under the public-private partnership model
Thang Long Corporation – JSC
6
Survey consultancy, preparation of the construction investment feasibility study report, environmental impact assessment and building information modelling (BIM), project DATP2-1: construction of the expressway section from the Toc Tien – Chau Pha intersection to Chau Duc Bridge (including Chau Duc Bridge at the boundary with Dong Nai Province), Ho Chi Minh City Ring Road 4 construction investment project
Ba Ria – Vung Tau Provincial Regional Transport and Agricultural Projects Management Unit
7
Survey consultancy, technical design and cost estimate, construction drawing design and BIM management model, project: road connecting to the Bien Hoa – Vung Tau Expressway (from Vung Van interchange to the PR.994 coastal road)
Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit
8
Survey consultancy, preparation of the technical design and cost estimate documents and construction drawing design, Component Project 3 of the Bien Hoa – Vung Tau Expressway construction investment project, phase 1
Cai Mep – Thi Vai Port Area Transport Project Management Unit
9
Survey consultancy and preparation of the pre-feasibility study report, Ba Ria – Vung Tau Main Road project (expressway connector from Vung Van roundabout on NH55 to Cua Lap roundabout on NH51B)
Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit
10
Survey consultancy and preparation of the feasibility study report (including BIM), Vung Tau Main Road project (section from the Vung Tau – Binh Thuan coastal road interchange (PR.994) to the Road 51B, C roundabout interchange, Vung Tau City)
Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit
11
Survey consultancy and preparation of the feasibility study report (including BIM), project: road connecting to the Bien Hoa – Vung Tau Expressway (from Vung Van interchange to the PR.994 coastal road)
Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit
12
Bien Hoa – Vung Tau Expressway – Component Project 3, phase 1
Cai Mep – Thi Vai Inter-port Road Project Management Unit
13
Survey, technical design and cost estimate (excluding the ITS system), design and staking out of the site clearance and right-of-way boundary markers for Km68+340 -:- Km99+000, Phan Thiet – Dau Giay construction investment component project, under the project for construction investment in several sections of the Eastern North – South Expressway, 2017-2020 phase
Thang Long Project Management Unit
14
Survey, technical design and cost estimate, staking out of the site clearance and right-of-way boundary markers for Km134-Km168, Vinh Hao – Phan Thiet construction investment component project, under the Vinh Hao – Phan Thiet section investment project of the project for investment in several sections of the Eastern North – South Expressway, 2017-2020 phase
Project Management Unit 7
15
Construction investment project for the Trung Luong – My Thuan Expressway, phase 1, under a BOT contract, Contract Package XL13 for Km76+934.28 -:- Km78+956.007; XL14 for the stretch Km78+956.007 -:- Km81+871.870
Trung Luong – My Thuan BOT Company
16
Technical survey, Component Project 3, NH5 section: Ha Noi – Hai Duong (Km43+900 – Km93+00) – VRAM
Project Management Unit 3 – Directorate for Roads of Vietnam
17
Technical survey, Component Project 3, NH6 section: Hoa Binh – Son La (Km78+300 – Km303+000) – VRAM
Project Management Unit 3 – Directorate for Roads of Vietnam
18
Technical survey, Component Project 3, NH38 section: Quan Goi – Yen Lenh (Km33+130 – Km52+827) – VRAM
Project Management Unit 3 – Directorate for Roads of Vietnam
19
Technical survey, Component Project 3, NH39-1 section: Trieu Duong – Hung Ha (Km42+714 – Km64+000) – VRAM
Project Management Unit 3 – Directorate for Roads of Vietnam
20
Technical survey, Component Project 3, NH48 section – Nghe An Province (Km 00 – Km 20 + Km 38 – Km 64) – VRAM
Project Management Unit 3 – Directorate for Roads of Vietnam
21
Preparation of construction investment projects for the Year 4 component projects – Road network maintenance component – WB4 Project
Project Management Unit 2 – Vietnam Road Administration
22
Survey and design consultancy, NH56 project – Ba Ria Town bypass
Cai Mep – Thi Vai Inter-port Road Project Management Unit
23
Survey and design consultancy, Ba Ria Town bypass project – NH56, Ba Ria – Vung Tau Province.
Cai Mep – Thi Vai Inter-port Road Project Management Unit
24
Survey and investigation for Year 3.2 of the programme (topographic, hydrological, geotechnical, pavement and traffic volume surveys, plus support and study of related engineering issues)
Egis Bceom International
25
Survey consultancy and preparation of the design documents, NH55 bypass through An Nhut Commune, Long Dien District and Dat Do Township, Dat Do District
Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit
26
Survey consultancy, preparation of the construction drawing design and cost estimate: road from NH12C to the Formosa integrated steel complex, Ha Tinh Province
Ha Tinh Provincial Economic Zone Construction Investment Project Management Unit
27
Survey and design consultancy for the widening of NH51 through Ba Ria – Vung Tau Province
Bien Hoa – Vung Tau Expressway Development JSC
28
Survey and design, project for the upgrading and widening of NH55 through Ba Ria – Vung Tau Province
Transport Project Management Unit I
29
Survey and design, final section of NH51 (NH51B route)
Transport Project Management Unit I
30
Survey and design, project for the upgrading and widening of NH56 through Ba Ria – Vung Tau Province
Transport Project Management Unit I
31
NH14 western bypass road, Buon Ma Thuot City
Buon Ma Thuot City Projects Management Unit
32
Eastern North – South Expressway, 2017-2020 phase, Vinh Hao – Phan Thiet section
Project Management Unit 7
33
Eastern North – South Expressway, 2017-2020 phase, Phan Thiet – Dau Giay section
Thang Long Project Management Unit
34
Survey and design of the Trung Luong – My Thuan Expressway (BOT project)
TEDI – Transport Engineering Design Incorporated, JSC
35
Survey and technical design with cost estimate, NH56 – Ba Ria Town bypass
Cai Mep – Thi Vai Inter-port Road Project Management Unit
36
NH55 bypass through An Ngai Commune (project)
Transport Project Management Unit II
37
Final section of NH51
Transport Project Management Unit I
38
Survey and detailed planning design of the interchanges and service roads on NH56
Ba Ria – Vung Tau Provincial Department of Transport
39
Survey and preparation of the construction investment project for the Ba Ria Town bypass – NH56, Ba Ria – Vung Tau Province.
Cai Mep – Thi Vai Inter-port Road Project Management Unit
40
Topographic and geotechnical survey and preparation of the construction drawing design and cost estimate, Contract Package TV-08, widening of NH51 (km47-Km56)
Bien Hoa – Vung Tau Expressway Development JSC
41
NH14 western bypass road, Buon Ma Thuot City, Contract Package No. 03 (2007 scheme)
Buon Ma Thuot City Projects Management Unit
42
NH14 western bypass road, Buon Ma Thuot City, Contract Package No. 04 (2007 scheme)
Buon Ma Thuot City Projects Management Unit
43
Survey and construction drawing design, upgrading and widening of NH55 (Contract Package No. 1 – Km45+850 -:- Km52+305)
Ba Ria – Vung Tau Transport Works JSC
44
Rehabilitation and upgrading of NH56 through Ba Ria – Vung Tau Province (Contract Package 1: Km18+020 -:- Km23+600)
Transport Works Company 875
45
Survey and construction drawing design, Contract Package No. 5 on NH55 (Dai Bridge, Trong Bridge, Nhan 1 Culvert, Nhan 2 Culvert, Suoi Da)
Huong Giang JSC – Ministry of National Defence
46
Construction drawing design, final section of NH51 (former NH51B route), Contract Package No. 01
Transport Project Management Unit I
47
Survey and technical design, NH55, Lang Dai – Binh Thuan section
Transport Project Management Unit I
48
Construction drawing design for the upgrading of NH51B (Contract Package No. 3)
Dong Tam Co., Ltd
49
Survey and technical design, NH56 (later section: Km18+020 -:- Km50+457)
Transport Project Management Unit I
50
Survey and project preparation, NH55, Lang Dai – Binh Thuan section
Transport Project Management Unit I