The Eastern North – South Expressway (Vinh Hao – Phan Thiet, Phan Thiet – Dau Giay), the Trung Luong – My Thuan Expressway and National Highways NH5, NH51, NH55 and NH56.

50 representative projects completed

No

Project Name

Project Owner

1

Survey and design consultancy for the Ho Tram – Long Thanh International Airport urban expressway project under the public-private partnership (PPP) model

Masterise Long Thanh – Ho Tram Expressway Infrastructure JSC (MAG)

2

Technical design consultancy for Km85+160-Km97+891 under the construction investment project to widen the Ho Chi Minh City – Trung Luong – My Thuan Expressway under the public-private partnership model

A2Z Construction Consultancy JSC

3

Survey, construction drawing design and building information modelling (BIM) consultancy, segment Km85+160 – Km92+370, Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City – Trung Luong – My Thuan Expressway under the public-private partnership model

Thanh Huy Group JSC

4

Survey, construction drawing design and building information modelling (BIM) consultancy, segment XL04 – Km92+370 – Km97+891,44 (including bridges), Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City – Trung Luong – My Thuan Expressway under the public-private partnership model

CII Infrastructure Construction JSC

5

Survey, construction drawing design and building information modelling (BIM) consultancy, segment XL04 – Km97+891,44 – 105 +454 (including bridges), Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City – Trung Luong – My Thuan Expressway under the public-private partnership model

Thang Long Corporation – JSC

6

Survey consultancy, preparation of the construction investment feasibility study report, environmental impact assessment and building information modelling (BIM), project DATP2-1: construction of the expressway section from the Toc Tien – Chau Pha intersection to Chau Duc Bridge (including Chau Duc Bridge at the boundary with Dong Nai Province), Ho Chi Minh City Ring Road 4 construction investment project

Ba Ria – Vung Tau Provincial Regional Transport and Agricultural Projects Management Unit

7

Survey consultancy, technical design and cost estimate, construction drawing design and BIM management model, project: road connecting to the Bien Hoa – Vung Tau Expressway (from Vung Van interchange to the PR.994 coastal road)

Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit

8

Survey consultancy, preparation of the technical design and cost estimate documents and construction drawing design, Component Project 3 of the Bien Hoa – Vung Tau Expressway construction investment project, phase 1

Cai Mep – Thi Vai Port Area Transport Project Management Unit

9

Survey consultancy and preparation of the pre-feasibility study report, Ba Ria – Vung Tau Main Road project (expressway connector from Vung Van roundabout on NH55 to Cua Lap roundabout on NH51B)

Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit

10

Survey consultancy and preparation of the feasibility study report (including BIM), Vung Tau Main Road project (section from the Vung Tau – Binh Thuan coastal road interchange (PR.994) to the Road 51B, C roundabout interchange, Vung Tau City)

Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit

11

Survey consultancy and preparation of the feasibility study report (including BIM), project: road connecting to the Bien Hoa – Vung Tau Expressway (from Vung Van interchange to the PR.994 coastal road)

Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit

12

Bien Hoa – Vung Tau Expressway – Component Project 3, phase 1

Cai Mep – Thi Vai Inter-port Road Project Management Unit

13

Survey, technical design and cost estimate (excluding the ITS system), design and staking out of the site clearance and right-of-way boundary markers for Km68+340 -:- Km99+000, Phan Thiet – Dau Giay construction investment component project, under the project for construction investment in several sections of the Eastern North – South Expressway, 2017-2020 phase

Thang Long Project Management Unit

14

Survey, technical design and cost estimate, staking out of the site clearance and right-of-way boundary markers for Km134-Km168, Vinh Hao – Phan Thiet construction investment component project, under the Vinh Hao – Phan Thiet section investment project of the project for investment in several sections of the Eastern North – South Expressway, 2017-2020 phase

Project Management Unit 7

15

Construction investment project for the Trung Luong – My Thuan Expressway, phase 1, under a BOT contract, Contract Package XL13 for Km76+934.28 -:- Km78+956.007; XL14 for the stretch Km78+956.007 -:- Km81+871.870

Trung Luong – My Thuan BOT Company

16

Technical survey, Component Project 3, NH5 section: Ha Noi – Hai Duong (Km43+900 – Km93+00) – VRAM

Project Management Unit 3 – Directorate for Roads of Vietnam

17

Technical survey, Component Project 3, NH6 section: Hoa Binh – Son La (Km78+300 – Km303+000) – VRAM

Project Management Unit 3 – Directorate for Roads of Vietnam

18

Technical survey, Component Project 3, NH38 section: Quan Goi – Yen Lenh (Km33+130 – Km52+827) – VRAM

Project Management Unit 3 – Directorate for Roads of Vietnam

19

Technical survey, Component Project 3, NH39-1 section: Trieu Duong – Hung Ha (Km42+714 – Km64+000) – VRAM

Project Management Unit 3 – Directorate for Roads of Vietnam

20

Technical survey, Component Project 3, NH48 section – Nghe An Province (Km 00 – Km 20 + Km 38 – Km 64) – VRAM

Project Management Unit 3 – Directorate for Roads of Vietnam

21

Preparation of construction investment projects for the Year 4 component projects – Road network maintenance component – WB4 Project

Project Management Unit 2 – Vietnam Road Administration

22

Survey and design consultancy, NH56 project – Ba Ria Town bypass

Cai Mep – Thi Vai Inter-port Road Project Management Unit

23

Survey and design consultancy, Ba Ria Town bypass project – NH56, Ba Ria – Vung Tau Province.

Cai Mep – Thi Vai Inter-port Road Project Management Unit

24

Survey and investigation for Year 3.2 of the programme (topographic, hydrological, geotechnical, pavement and traffic volume surveys, plus support and study of related engineering issues)

Egis Bceom International

25

Survey consultancy and preparation of the design documents, NH55 bypass through An Nhut Commune, Long Dien District and Dat Do Township, Dat Do District

Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit

26

Survey consultancy, preparation of the construction drawing design and cost estimate: road from NH12C to the Formosa integrated steel complex, Ha Tinh Province

Ha Tinh Provincial Economic Zone Construction Investment Project Management Unit

27

Survey and design consultancy for the widening of NH51 through Ba Ria – Vung Tau Province

Bien Hoa – Vung Tau Expressway Development JSC

28

Survey and design, project for the upgrading and widening of NH55 through Ba Ria – Vung Tau Province

Transport Project Management Unit I

29

Survey and design, final section of NH51 (NH51B route)

Transport Project Management Unit I

30

Survey and design, project for the upgrading and widening of NH56 through Ba Ria – Vung Tau Province

Transport Project Management Unit I

31

NH14 western bypass road, Buon Ma Thuot City

Buon Ma Thuot City Projects Management Unit

32

Eastern North – South Expressway, 2017-2020 phase, Vinh Hao – Phan Thiet section

Project Management Unit 7

33

Eastern North – South Expressway, 2017-2020 phase, Phan Thiet – Dau Giay section

Thang Long Project Management Unit

34

Survey and design of the Trung Luong – My Thuan Expressway (BOT project)

TEDI – Transport Engineering Design Incorporated, JSC

35

Survey and technical design with cost estimate, NH56 – Ba Ria Town bypass

Cai Mep – Thi Vai Inter-port Road Project Management Unit

36

NH55 bypass through An Ngai Commune (project)

Transport Project Management Unit II

37

Final section of NH51

Transport Project Management Unit I

38

Survey and detailed planning design of the interchanges and service roads on NH56

Ba Ria – Vung Tau Provincial Department of Transport

39

Survey and preparation of the construction investment project for the Ba Ria Town bypass – NH56, Ba Ria – Vung Tau Province.

Cai Mep – Thi Vai Inter-port Road Project Management Unit

40

Topographic and geotechnical survey and preparation of the construction drawing design and cost estimate, Contract Package TV-08, widening of NH51 (km47-Km56)

Bien Hoa – Vung Tau Expressway Development JSC

41

NH14 western bypass road, Buon Ma Thuot City, Contract Package No. 03 (2007 scheme)

Buon Ma Thuot City Projects Management Unit

42

NH14 western bypass road, Buon Ma Thuot City, Contract Package No. 04 (2007 scheme)

Buon Ma Thuot City Projects Management Unit

43

Survey and construction drawing design, upgrading and widening of NH55 (Contract Package No. 1 – Km45+850 -:- Km52+305)

Ba Ria – Vung Tau Transport Works JSC

44

Rehabilitation and upgrading of NH56 through Ba Ria – Vung Tau Province (Contract Package 1: Km18+020 -:- Km23+600)

Transport Works Company 875

45

Survey and construction drawing design, Contract Package No. 5 on NH55 (Dai Bridge, Trong Bridge, Nhan 1 Culvert, Nhan 2 Culvert, Suoi Da)

Huong Giang JSC – Ministry of National Defence

46

Construction drawing design, final section of NH51 (former NH51B route), Contract Package No. 01

Transport Project Management Unit I

47

Survey and technical design, NH55, Lang Dai – Binh Thuan section

Transport Project Management Unit I

48

Construction drawing design for the upgrading of NH51B (Contract Package No. 3)

Dong Tam Co., Ltd

49

Survey and technical design, NH56 (later section: Km18+020 -:- Km50+457)

Transport Project Management Unit I

50

Survey and project preparation, NH55, Lang Dai – Binh Thuan section

Transport Project Management Unit I