Road 991B, the Phuoc Hoa – Cai Mep road, the sections of the Cai Mep – Thi Vai inter-port road and the Ba Ria – Vung Tau coastal road.

27 representative projects completed

No

Project Name

Project Owner

1

Geotechnical survey for the technical design and cost estimate stage, and construction drawing design, Road 991B from NH51 to the downstream area of Cai Mep Port, BRIDGE SECTION

Cai Mep – Thi Vai Inter-port Road Project Management Unit

2

Survey, technical design and cost estimate, and construction drawing design, Road 991B from NH51 to the downstream area of Cai Mep Port, ROAD SECTION (excluding the overpass at the NH51 interchange)

Cai Mep – Thi Vai Inter-port Road Project Management Unit

3

Survey and construction drawing design, Phuoc Hoa – Cai Mep road, road section

Cai Mep – Thi Vai Inter-port Road Project Management Unit

4

Survey consultancy, technical design, construction drawing design and cost estimate for the stretch from Km16+200 to Km16+380 of inter-port road section 7 (Km15+561,31-Km17+271,13)

Cai Mep – Thi Vai Inter-port Road Project Management Unit

5

Survey and construction drawing design, Cai Mep – Thi Vai inter-port road, Section 8

Cai Mep – Thi Vai Inter-port Road Project Management Unit

6

Survey and technical design, Cai Mep – Thi Vai inter-port road, Section 8

Cai Mep – Thi Vai Inter-port Road Project Management Unit

7

Construction drawing design – coastal road from Cua Lap Bridge to Lo Voi junction, Long Dien District

Long Dien District Construction Investment Project Management Unit

8

Survey and project preparation, Road N4 around the shore of Xuyen Moc Lake

Xuyen Moc District Construction Investment Project Management Unit

9

Survey for the technical design stage, technical design and cost estimate, and construction drawing design, road and bridge from Go Gang to Long Son, section connecting to the Lang Cat – Long Son road

Transport Project Management Unit I

10

Survey and preparation of the construction investment project for the rehabilitation and upgrading of the coastal road from Cua Lap Bridge to Lo Voi junction, Long Dien District

Long Dien District Construction Investment Project Management Unit

11

Survey, technical design and cost estimate, Section 4 of the Cai Mep – Thi Vai inter-port road

Cai Mep – Thi Vai Inter-port Road Project Management Unit

12

Survey, technical design and construction drawing design, revised road from Go Gang Island to Long Son Island (following the change of scale)

Transport Project Management Unit I

13

Survey and construction drawing design for the additional 22 kV power line, transformer station and lighting system, Dung Quat – Sa Huynh coastal road, My Khe – Tra Khuc section

Quang Ngai Provincial Department of Transport

14

Survey and project preparation, road and bridge from Go Gang to Long Son, section connecting to the Lang Cat – Long Son road

Transport Project Management Unit I

15

Survey, technical design and cost estimate, alignment of Section 7 of the Cai Mep – Thi Vai inter-port road (Km15+561,31 -:- Km17+271,13)

Cai Mep – Thi Vai Inter-port Road Project Management Unit

16

Topographic, geotechnical and hydrological survey of Vam Gui Bridge, Cai Mep – Thi Vai inter-port road project, Section 1 (Km0+000 -:- Km1+898,03)

Tan Phat JSC

17

Survey, technical design and cost estimate, road works of Section 6 of the Cai Mep – Thi Vai inter-port road

Cai Mep – Thi Vai Inter-port Road Project Management Unit

18

Survey, technical design and cost estimate, road works of Section 1 of the Cai Mep – Thi Vai inter-port road

Cai Mep – Thi Vai Inter-port Road Project Management Unit

19

Survey and construction drawing design, Section 3 (Km7+199,25 -:- Km9+612,64) of the Cai Mep – Thi Vai inter-port road project

Cai Mep – Thi Vai Inter-port Road Project Management Unit

20

Survey and project preparation, Road 991B from NH51 to the downstream area of Cai Mep Port, Tan Thanh District.

Cai Mep – Thi Vai Inter-port Road Project Management Unit

21

Survey and project preparation, Phuoc Hoa – Cai Mep road, Tan Thanh District

Cai Mep – Thi Vai Inter-port Road Project Management Unit

22

Survey and technical design, Section 3 (Km7+199,25 -:- Km9+612,64) of the Cai Mep – Thi Vai inter-port road

Cai Mep – Thi Vai Inter-port Road Project Management Unit

23

Topographic and geotechnical survey and project preparation for the alignment of the Cai Mep – Thi Vai inter-port road

Major Bridge and Tunnel Design Consultancy JSC

24

Survey and construction drawing design, Dung Quat – Sa Huynh coastal road, My Khe – Tra Khuc section

Quang Ngai Provincial Department of Transport

25

Technical infrastructure for the residential area along the Bau Giang – Cau Moi corridor (main roads, concrete roads, pavements, landscaping, power supply and lighting systems)

Quang Ngai Provincial Construction Investment Projects Management Unit

26

Survey, technical design and construction drawing design, road from Go Gang Island to Long Son Island, Long Son Commune, Vung Tau City

Transport Project Management Unit I

27

Survey, technical and construction design, Vung Tau – Binh Thuan (VT – BT) coastal road, Ben Loi – Binh Chau section (70 km)

Transport Project Management Unit I