Upgrading and widening of provincial roads (PR.992, PR.995B, PR.991 extension, 328, 44B) and urban roads in Vung Tau, Phu My, Dat Do and Xuyen Moc.
78 representative projects completed
No |
Project Name |
Project Owner |
|
1 |
Survey consultancy, preparation of the technical design and cost estimate documents, construction drawing design and building information modelling (BIM), project for the upgrading and widening of the Hoi Bai – Phuoc Tan road (PR.992) from NH51 to the Bien Hoa – Vung Tau Expressway |
Cai Mep – Thi Vai Inter-port Road Project Management Unit |
|
2 |
Survey consultancy and construction design (including building information modelling, BIM), Provincial Road 991 extension project (from NH51 to the Cai Mep – Thi Vai inter-port road) |
Cai Mep – Thi Vai Port Area Transport Project Management Unit |
|
3 |
Survey consultancy and construction design following the basic design, project for the upgrading and widening of the Ba Ria – Chau Pha – Hac Dich road (PR.995B) |
Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit |
|
4 |
Survey consultancy and construction design, project for the upgrading and widening of Provincial Road 328 (remaining section), Xuyen Moc District |
Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit |
|
5 |
Survey consultancy and construction design, project for the upgrading of Provincial Road 44B within Long Dien District and Dat Do District |
Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit |
|
6 |
Survey consultancy and construction design, project for the rehabilitation and upgrading of the Minh Dam mountainside road from PR.44A beside the Thuy Duong tourist resort to Long Phu junction, Phuoc Hai Township, Dat Do District |
Dat Do District Construction Investment Project Management Unit |
|
7 |
Survey and design consultancy, Provincial Road 44B (section from Bau Ong Dan junction to Provincial Road 52) |
Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit |
|
8 |
Survey and design consultancy, project for the rehabilitation and upgrading of the Minh Dam mountainside road from PR.44A beside the Thuy Duong tourist resort to Long Phu junction, Phuoc Hai Township, Dat Do District. |
Dat Do District Construction Investment Project Management Unit |
|
9 |
Survey and design consultancy, Thong Nhat Road (extension), Wards 1 and 3 and Thang Tam Ward, Vung Tau City |
Vung Tau City Construction Investment Project Management Unit No. 1 |
|
10 |
Survey and design consultancy, Planned Road AIII, Ward 12, Vung Tau City |
Vung Tau City Construction Investment Project Management Unit No. 1 |
|
11 |
Survey and design consultancy, Planned Road P (sections 1 and 2, from Road 13 to Planned Road 33), Phu My Township |
Tan Thanh District Construction Investment Project Management Unit |
|
12 |
Survey and design consultancy for the upgrading and widening of Provincial Road 328, Xuyen Moc District |
Transport Project Management Unit II |
|
13 |
Survey and design consultancy, 30/4 Road project from Chi Linh junction to Eo Ong Tu, Vung Tau City |
Transport Project Management Unit I |
|
14 |
Survey and design consultancy, Binh Ba – Da Bac – Phuoc Tan road project (Hoi Bai – Chau Pha – Da Bac – Phuoc Tan road, phase 2) |
Transport Project Management Unit II |
|
15 |
Survey and design consultancy, Phuoc Hai – Dat Do road project |
Dat Do Construction Investment Project Management Unit |
|
16 |
Survey and design consultancy, Hang Dieu Road project (section from 30/4 Road to Road 51C), Vung Tau City |
Vung Tau City Construction Investment Project Management Unit No. 1 |
|
17 |
Survey and design consultancy, investment project for the upgrading of the Lang Cat – Long Son road (Hoang Sa Road) |
Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit |
|
18 |
Survey consultancy, design and BIM management model, project: Nguyen Phong Sac Road, Vung Tau City. |
Ba Ria – Vung Tau Provincial Specialised Transport and Civil Works Project Management Unit |
|
19 |
Survey and design consultancy, Planned Road D13, Residential Area No. 9 (western branch of Road S), Phu My Town, Ba Ria – Vung Tau Province |
Phu My Town Construction Investment Project Management Unit |
|
20 |
Survey and design consultancy, Binh Gia Road project (section from 30/4 Road to the connection with 2/9 Road), Vung Tau City |
Vung Tau City Construction Investment Project Management Unit No. 2 |
|
21 |
Survey and design consultancy, project for the rehabilitation and upgrading of Road 965, Phu My Town |
Cai Mep – Thi Vai Port Area Transport Project Management Unit |
|
22 |
Survey and construction drawing design, rehabilitation and upgrading of the Minh Dam mountainside road from PR.44 beside the Thuy Duong tourist resort to Long Phu junction, Phuoc Hai Township, Dat Do District (phase 1) |
Dat Do District Construction Investment Project Management Unit |
|
23 |
Survey and construction drawing design, Provincial Road 52 through the centre of Long Tan Commune, Dat Do District (Km31+900 -:- Km32+947 and Km37+340 -:- Km37+880) |
Dat Do District Construction Investment Project Management Unit |
|
24 |
Planned Road P (sections 1 and 2, from Road 13 to Planned Road 33), Phu My Township |
Tan Thanh District Construction Investment Project Management Unit |
|
25 |
Provincial Road 328 (project) |
Transport Project Management Unit II |
|
26 |
Survey and re-preparation of the construction investment project for Nguyen Tat Thanh Road (extension of Planned Road No. 02), Ba Ria Town |
Ba Ria Town Construction Investment Project Management Unit |
|
27 |
Survey and re-preparation of the construction investment project for Rural Road 10, Ba Ria Town |
Ba Ria Town Construction Investment Project Management Unit |
|
28 |
Survey and technical design; survey and construction drawing design, 30/4 Road from Chi Linh junction to Eo Ong Tu, Vung Tau City |
Transport Project Management Unit I |
|
29 |
Topographic and geotechnical survey for the project preparation stage, headquarters and service port of the Ba Ria – Vung Tau Provincial Inland Waterway Port Authority |
Inland Waterway Port Authority |
|
30 |
Construction drawing design, Planned Road No. 7, Long Hai Township, Long Dien District |
Long Dien District Construction Investment Project Management Unit |
|
31 |
Survey and preparation of the construction investment project for Planned Road No. 7, Long Hai Township, Long Dien District (Section 1) |
Long Dien District Construction Investment Project Management Unit |
|
32 |
Revised design of the patrol trail combined with eco-tourism, Con Dao National Park |
Con Dao National Park Management Board |
|
33 |
Survey and construction drawing design, Hai Lam – Bau Tru road, Long Dien District |
Long Dien District Construction Investment Project Management Unit |
|
34 |
Survey and construction drawing design, Binh Ba – Da Bac – Phuoc Tan road (Hoi Bai – Chau Pha – Da Bac – Phuoc Tan road, phase 2) |
Transport Project Management Unit II |
|
35 |
Survey and construction drawing design, Planned Road No. 02, Phuoc Buu, Xuyen Moc District |
Xuyen Moc District Construction Investment Project Management Unit |
|
36 |
Survey and construction drawing design, Phuoc Hai – Dat Do road |
Dat Do District Construction Investment Project Management Unit |
|
37 |
Survey and preparation of the construction investment project for the Bau Bang residential and resettlement area, Xuyen Moc District |
Xuyen Moc District Construction Investment Project Management Unit |
|
38 |
Survey and construction drawing design, Planned Road No. 9, Long Hai, Long Dien District |
Long Dien District Construction Investment Project Management Unit |
|
39 |
Topographic, geotechnical and pavement-subgrade survey and preparation of the investment project for 30/4 Road from Chi Linh junction to Eo Ong Tu, Vung Tau City |
Transport Project Management Unit I |
|
40 |
Topographic and geotechnical survey and construction drawing design, Planned Road No. 4, section 2, Phuoc Buu Township, Xuyen Moc District |
Xuyen Moc District Construction Investment Project Management Unit |
|
41 |
Topographic, hydrological and geotechnical survey under the consultancy package for survey, technical design, construction drawing design and cost estimate of the box culvert protecting the oil pipeline of Phu My Power Plant and of Rach Muong Bridge (within inter-port road section 7) |
Major Bridge and Tunnel Design Consultancy JSC |
|
42 |
Survey and construction drawing design, revised Contract Package No. 03 (subgrade, pavement and stormwater drainage over Km10 -Km11, Km11+400 -:- Km13+100 and Km13+650 -:- Km13+954,04), Western Ring Road, Buon Ma Thuot City (2010) |
Buon Ma Thuot City Projects Management Unit |
|
43 |
Survey and construction drawing design, revised Contract Package No. 04 (prestressed reinforced concrete bridge at Km13+475 and the bridge approach roads over Km13+100 -:- Km13+650), Western Ring Road, Buon Ma Thuot City (2010) |
Buon Ma Thuot City Projects Management Unit |
|
44 |
Survey and preparation of the investment project for the Phuoc Hai – Dat Do road |
Dat Do District Construction Investment Project Management Unit |
|
45 |
Survey and construction drawing design, revised Contract Package No. 03, Western Ring Road, Buon Ma Thuot City (2009) |
Buon Ma Thuot City Projects Management Unit |
|
46 |
Survey and construction drawing design, revised Contract Package No. 04, Western Ring Road, Buon Ma Thuot City (2009) |
Buon Ma Thuot City Projects Management Unit |
|
47 |
Survey and construction drawing design, Planned Road No. 2 (phase 1), Phuoc Hai Township, Dat Do District |
Dat Do District Construction Investment Project Management Unit |
|
48 |
Construction drawing design for the upgrading of Ngo Quyen Road, Ward 10, Vung Tau City |
Vung Tau City Construction Investment Project Management Unit |
|
49 |
Construction drawing design, Road D10, Ward 10, Vung Tau City |
Ba Ria – Vung Tau Provincial Land Fund Development Centre |
|
50 |
Survey and construction drawing design, Phuoc Hai – Loc An road, Phuoc Hai Commune, Dat Do |
Dat Do District Construction Investment Project Management Unit |
|
51 |
Construction drawing design, Planned Road No. 2, Phuoc Long Tho Commune, Dat Do District |
Dat Do District Construction Investment Project Management Unit |
|
52 |
Construction drawing design, Planned Road No. 3, Phuoc Long Tho Commune |
Dat Do District Construction Investment Project Management Unit |
|
53 |
Survey and preparation of the investment project for Planned Road N1, Chi Linh – Cua Lap tourist area, Vung Tau City |
Vung Tau City Construction Investment Project Management Unit |
|
54 |
Survey and preparation of the investment project for Planned Road B2, Chi Linh – Cua Lap tourist area, Vung Tau City |
Vung Tau City Construction Investment Project Management Unit |
|
55 |
Investment project for the road up Nui Lon, Vung Tau City |
Transport Project Management Unit II |
|
56 |
Survey and construction drawing design, Provincial Road 52 through the Dat Do District town centre |
Dat Do District Construction Investment Project Management Unit |
|
57 |
Revised technical design, Chi Linh Road (Nguyen Huu Canh) |
Transport Project Management Unit I |
|
58 |
Technical design, North – South Axis Road No. 3 (Loc An – Suoi Rao road), Ba Ria – Vung Tau Province |
Transport Project Management Unit I |
|
59 |
Construction drawing design, Planned Road No. 14, Kim Dinh Ward, Ba Ria Town |
Ba Ria Town Construction Investment Project Management Unit |
|
60 |
Investment project for the rehabilitation and upgrading of the Minh Dam mountainside road from PR.44 beside the Thuy Duong tourist resort to Long Phu junction, Loc An Commune (basic design appraisal already obtained) |
Dat Do District Construction Investment Project Management Unit |
|
61 |
Survey and preparation of the investment project for Provincial Road 52 through the Dat Do District town centre |
Dat Do District Construction Investment Project Management Unit |
|
62 |
Economic-technical report, road from Mr Hoai’s land to Lo O, Phuoc Long Tho, continuing to Bau Beo (the former Bau Beo road) |
Dat Do District Construction Investment Project Management Unit |
|
63 |
Technical infrastructure, Minh Dam mountain tourist area |
Dat Do District Construction Investment Project Management Unit |
|
64 |
Technical design for the upgrading of the eco-tourism trail system, Con Dao National Park |
Con Dao National Park Management Board |
|
65 |
Survey, project preparation and technical and construction design for the rehabilitation and upgrading of Rural Road 3, Ba Ria Town |
Ba Ria Town Construction Investment Project Management Unit |
|
66 |
Survey, project preparation and technical and construction design for the rehabilitation and upgrading of Rural Road 8, Ba Ria Town |
Ba Ria Town Construction Investment Project Management Unit |
|
67 |
Technical design, Chau Pha – Phuoc Tan road (branch 2) |
Transport Project Management Unit I |
|
68 |
North – South main road (phase 3), Long Dat District (replaced by a red-gravel rural road from NH55 to Chan Tien Mountain, An Ngai Commune) |
Long Dien District Construction Investment Project Management Unit |
|
69 |
Design of Planned Road No. 2, Phuoc Buu Township, Xuyen Moc District |
Xuyen Moc District Construction Investment Project Management Unit |
|
70 |
Provincial Road 44B – phase 2, Long Dat District |
Long Dien District Construction Investment Project Management Unit |
|
71 |
Project for the tourist jetties at Hon Cau and Hon Bay Canh and the eco-tourism trails of Con Dao National Park (trail system, plus the tourist jetties at Hon Cau and Hon Bay Canh) |
Con Dao National Park Management Board |
|
72 |
Project preparation and technical design, Planned Road No. 5 (Road 328 extension to Xom Ray) |
Xuyen Moc District Construction Investment Project Management Unit |
|
73 |
Survey and technical design, access road to the Nui Dinh tourist area (Package 1) |
Transport Project Management Unit I |
|
74 |
Technical design, ring road adjoining the provincial Administrative and Political Centre |
Project Management Unit of the Ba Ria – Vung Tau Provincial Department of Construction |
|
75 |
Technical design, Planned Road No. 11 (section linking NH56 and Rural Road 10), Ba Ria Town |
Ba Ria Town Construction Investment Project Management Unit |
|
76 |
Project for the ring road adjoining the Administrative and Political Centre |
Project Management Unit of the Ba Ria – Vung Tau Provincial Department of Construction |
|
77 |
Survey and design, Rural Transport Project 2, Ba Ria – Vung Tau Province (48.8 km) – Class VI road) |
Transport Project Management Unit I |
|
78 |
Upgrading of Le Loi Road, Vung Tau City |
Transport Project Management Unit I |
