224 representative projects completed
Scope of activities
- New expressways, expressway widening, access roads
- Town bypasses, upgrading and widening of national roads
- Coastal roads and inter-port roads
- Soft-ground subgrade: organic removal, geotextile, cement columns
- Provincial roads, district roads, Class VI rural roads
- Urban streets, tourist access roads, eco-tourism trails
- Interchange and service-road planning, right-of-way markers
- Surveys and supervision of bridge, road and signal maintenance
Roads are TDC's largest body of work: the Eastern North–South, Bien Hoa – Vung Tau, Trung Luong – My Thuan and Ho Tram – Long Thanh expressways; National Roads QL1, QL14, QL18, QL20, QL51, QL55 and QL56; and the provincial road network, urban streets, coastal roads and inter-port roads crossing soft ground in Ba Ria – Vung Tau.
New and widened alignments
- Topographic survey with Flycam and GPS RTK; pre-feasibility and feasibility studies; technical design, construction drawings and cost estimates.
- Expressway access roads, bypasses, service roads and detailed planning of interchanges on national roads.
- Coastal roads including 22 kV lines, substations and lighting.
- Right-of-way pegging and boundary markers; BIM models for urban roads and expressway connectors.
Subgrade and pavement
- Inter-port roads across soft ground: testing of organic-soil removal, geotextile, sand fill and cement-stabilised soil columns, including trial construction sections.
- Subgrade and pavement testing for national and provincial roads at the LAS-XD HCM.013 laboratory.
Operation and maintenance
- Technical surveys of sections of QL5, QL6, QL38, QL39 and QL48 for the national road network maintenance project (VRAMP).
- Supervision of bridge and road maintenance; installation of traffic signals, signs and bus stops; local repairs of subgrade and pavement.
Experience and capability
The Company has surveyed nearly 400 km of national roads under VRAMP and has designed and supervised many sections of QL1, QL14, QL18, QL20, QL51, QL55 and QL56.
Completed projects
projects
| No. | Project name | Project owner | Stage of involvement |
|---|---|---|---|
| 1 | Supervision Consulting for the Project: Management and Maintenance of the Bridge, Road and Waterway System in Ba Ria – Vung Tau Province, 2017 | Ba Ria – Vung Tau Department of Transport | Construction supervision |
| 2 | Supervision Consulting for the Project: Management and Maintenance of the Bridge, Road and Waterway System in Ba Ria – Vung Tau Province, 2016 | Ba Ria – Vung Tau Department of Transport | Construction supervision |
| 3 | Supervision Consulting for the Project: Management and Maintenance of the Bridge, Road and Waterway System in Ba Ria – Vung Tau Province, 2015 | Ba Ria – Vung Tau Department of Transport | Construction supervision |
| 4 | Provincial Road DT.992B (from DT.992C to DT.992) (2026) | Project Steering Board 8 – HCMC Transport Board | Investment policy |
| 5 | Renovation and repair of Huynh Tri Manh Street, Phuoc Lap Quarter, My Xuan Ward, Phu My City (2025) | Phu My Ward Construction Investment PMB | Investment policyEcon.-technical report |
| 6 | Repair and renovation of the My Xuan – Toc Tien inter-ward road, My Xuan Ward, Phu My City (2025) | Phu My Ward Construction Investment PMB | Investment policyEcon.-technical report |
| 7 | Road connecting National Road 56 and Provincial Road 997, Chau Duc District (component project 01: from PR.997 to PR.765) (2025) | Ngai Giao Commune People's Committee | Construction drawings |
| 8 | Kim Long – Binh Ba road, Chau Duc District (2025) | Ngai Giao Commune People's Committee | Construction drawings |
| 9 | Repair and renovation of Ly Thai To Street, Phu My Ward, Phu My City (2025) | Phu My Ward Construction Investment PMB | Investment policyFeasibility studyEcon.-technical report |
| 10 | Repair and renovation of the road from Group 6 to Group 7, Quarter 5, Hac Dich Ward, Phu My City (2025) | Phu My Ward Construction Investment PMB | Investment policyEcon.-technical report |
| 11 | Repair and renovation of the road from Niet Ban Pagoda to Truong Chinh Street, My Xuan Ward, Phu My City (2025) | Phu My Ward Construction Investment PMB | Investment policyEcon.-technical report |
| 12 | Access road to Chau Pha stadium (2024) | Phu My Ward Construction Investment PMB | Construction drawings |
| 13 | Nguyen Binh Khiem Street, Vung Tau City (2024) | Tam Thang Ward Construction Investment PMB | Construction drawings |
| 14 | Planned road N4, Dat Do Town (2023–2024) | Dat Do Commune Construction Investment PMB | Feasibility studyConstruction drawings |
| 15 | Extension of roads D3 and D5, Hoa Long Commune (2023) | Ba Ria Ward Construction Investment PMB | Construction drawings |
| 16 | Sidewalk paving of roads in Tan Hung Commune (Nguyen Huu Canh Street extension) (2023) | Ba Ria Ward Construction Investment PMB | Econ.-technical report |
| 17 | Hoang Van Thu Street, Long Tam Ward, Ba Ria (2022) | Ba Ria Ward Construction Investment PMB | Construction drawings |
| 18 | Huynh Khuong Ninh Street, Kim Dinh Ward (2022) | Ba Ria Ward Construction Investment PMB | Construction drawings |
| 19 | Planned road beside the dog farm, Long Tam Ward (2022) | Ba Ria Ward Construction Investment PMB | Construction drawings |
| 20 | Road beside the Long Phuoc tunnels, Long Phuoc Commune (2021) | Ba Ria Ward Construction Investment PMB | Construction drawings |
| 21 | Nguyen Thai Hoc Street, Long Toan Ward (2021) | Ba Ria Ward Construction Investment PMB | Construction drawings |
| 22 | Road behind My Xuan – Thi Vai port (phase 2) (2018–2025) | Project Steering Board 8 – HCMC Transport Board | Feasibility studyConstruction drawings |
| 23 | Long Son – Cai Mep road, Vung Tau City (2016–2019) | Project Steering Board 8 – HCMC Transport Board | Investment policyFeasibility studyTechnical designConstruction drawings |
| 24 | Renovation and upgrading of Le Phung Hieu Street | Tam Thang Ward Construction Investment PMB | Investment policy |
| 25 | Renovation, upgrading and widening of Nguyen Van Linh Street (Con Dao) | Con Dao Special Zone Construction Investment PMB | Feasibility study |
| 26 | Road 995C (Nghia Thanh – Cu Bi) | Project Steering Board 12 – HCMC Transport Board | Investment policy |
| 27 | Biet Chinh Street (from 30/4 Street to 3/2 Street), Vung Tau City (Luu Chi Hieu Street) | Rach Dua Ward Construction Investment PMB | Investment policy |
| 28 | Provincial Road DT.992C (from National Road 51 to Ring Road 4) | Project Steering Board 8 – HCMC Transport Board | Investment policy |
| 29 | Binh Gia – Binh Trung – Quang Thanh connecting road (District Road 29C) | Binh Gia Commune Construction Investment PMB | Investment policy |
| 30 | Planned road N11, Phu My new urban area | Phu My Ward Construction Investment PMB | Investment policyFeasibility study |
| 31 | Planned road N12, Phu My new urban area | Phu My Ward Construction Investment PMB | Investment policyFeasibility study |
| 32 | Planned road N10 – Phu My Ward | Phu My Ward Construction Investment PMB | Construction drawings |
| 33 | Road No. 82 (Tam Long Ward) | Tam Long Ward Construction Investment PMB | Investment policyFeasibility study |
| 34 | Access road to the Long Son LNG plant | Long Son Commune Construction Investment PMB | Investment policy |
| 35 | Vo Van Kiet Street extension (Tam Long Ward) | Tam Long Ward Construction Investment PMB | Investment policyFeasibility study |
| 36 | Xa Bang – Lang Lon road | Chau Duc Commune Construction Investment PMB | Investment policy |
| 37 | Widening of the Song Xoai Commune centre road (former My Xuan – Ngai Giao road) | Tan Thanh Ward Construction Investment PMB | Feasibility study |
| 38 | Upgrading and widening of District Road 14 (Long Dien Commune) | Long Dien Commune Construction Investment PMB | Investment policy |
| 39 | Upgrading and widening of Luong The Vinh Street (remaining section extended to 2/9 Street), Vung Tau City | Tam Thang Ward Construction Investment PMB | Investment policy |
| 40 | Upgrading and widening of Alley 220, Phan Chu Trinh Street, Vung Tau Ward | Vung Tau Ward Construction Investment PMB | Feasibility study |
| 41 | Road connecting Vinh Binh – Vinh An – Hau Can hamlets (Binh Gia Commune) | Binh Gia Commune Construction Investment PMB | Feasibility study |
| 42 | Survey and design consultancy for the Ho Tram – Long Thanh International Airport urban expressway project under the public-private partnership (PPP) model | Masterise Long Thanh – Ho Tram Expressway Infrastructure JSC (MAG) | SurveyDesign |
| 43 | Technical design consultancy for Km85+160-Km97+891 under the construction investment project to widen the Ho Chi Minh City – Trung Luong – My Thuan Expressway under the public-private partnership model | A2Z Construction Consultancy JSC | Technical design |
| 44 | Survey, construction drawing design and building information modelling (BIM) consultancy, segment Km85+160 – Km92+370, Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City – Trung Luong – My Thuan Expressway under the public-private partnership model | Thanh Huy Group JSC | SurveyConstruction drawings |
| 45 | Survey, construction drawing design and building information modelling (BIM) consultancy, segment XL04 – Km92+370 – Km97+891,44 (including bridges), Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City – Trung Luong – My Thuan Expressway under the public-private partnership model | CII Infrastructure Construction JSC | SurveyConstruction drawings |
| 46 | Survey, construction drawing design and building information modelling (BIM) consultancy, segment XL04 – Km97+891,44 – 105 +454 (including bridges), Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City – Trung Luong – My Thuan Expressway under the public-private partnership model | Thang Long Corporation – JSC | SurveyConstruction drawings |
| 47 | Survey consultancy, preparation of the construction investment feasibility study report, environmental impact assessment and building information modelling (BIM), project DATP2-1: construction of the expressway section from the Toc Tien – Chau Pha intersection to Chau Duc Bridge (including Chau Duc Bridge at the boundary with Dong Nai Province), Ho Chi Minh City Ring Road 4 construction investment project | Ba Ria – Vung Tau Provincial Regional Transport and Agricultural Projects Management Unit | SurveyFeasibility study |
| 48 | Survey consultancy, technical design and cost estimate, construction drawing design and BIM management model, project: road connecting to the Bien Hoa – Vung Tau Expressway (from Vung Van interchange to the PR.994 coastal road) | Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit | SurveyTechnical designConstruction drawings |
| 49 | Survey consultancy, preparation of the technical design and cost estimate documents and construction drawing design, Component Project 3 of the Bien Hoa – Vung Tau Expressway construction investment project, phase 1 | Cai Mep – Thi Vai Port Area Transport Project Management Unit | SurveyTechnical designConstruction drawings |
| 50 | Survey consultancy and preparation of the pre-feasibility study report, Ba Ria – Vung Tau Main Road project (expressway connector from Vung Van roundabout on NH55 to Cua Lap roundabout on NH51B) | Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit | SurveyPre-feasibility study |
| 51 | Survey consultancy and preparation of the feasibility study report (including BIM), Vung Tau Main Road project (section from the Vung Tau – Binh Thuan coastal road interchange (PR.994) to the Road 51B, C roundabout interchange, Vung Tau City) | Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit | SurveyFeasibility study |
| 52 | Survey consultancy and preparation of the feasibility study report (including BIM), project: road connecting to the Bien Hoa – Vung Tau Expressway (from Vung Van interchange to the PR.994 coastal road) | Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit | SurveyFeasibility study |
| 53 | Bien Hoa – Vung Tau Expressway – Component Project 3, phase 1 | Cai Mep – Thi Vai Inter-port Road Project Management Unit | — |
| 54 | Survey, technical design and cost estimate (excluding the ITS system), design and staking out of the site clearance and right-of-way boundary markers for Km68+340 -:- Km99+000, Phan Thiet – Dau Giay construction investment component project, under the project for construction investment in several sections of the Eastern North – South Expressway, 2017-2020 phase | Thang Long Project Management Unit | SurveyTechnical design |
| 55 | Survey, technical design and cost estimate, staking out of the site clearance and right-of-way boundary markers for Km134-Km168, Vinh Hao – Phan Thiet construction investment component project, under the Vinh Hao – Phan Thiet section investment project of the project for investment in several sections of the Eastern North – South Expressway, 2017-2020 phase | Project Management Unit 7 | SurveyTechnical design |
| 56 | Construction investment project for the Trung Luong – My Thuan Expressway, phase 1, under a BOT contract, Contract Package XL13 for Km76+934.28 -:- Km78+956.007; XL14 for the stretch Km78+956.007 -:- Km81+871.870 | Trung Luong – My Thuan BOT Company | — |
| 57 | Technical survey, Component Project 3, NH5 section: Ha Noi – Hai Duong (Km43+900 – Km93+00) – VRAM | Project Management Unit 3 – Directorate for Roads of Vietnam | Survey |
| 58 | Technical survey, Component Project 3, NH6 section: Hoa Binh – Son La (Km78+300 – Km303+000) – VRAM | Project Management Unit 3 – Directorate for Roads of Vietnam | Survey |
| 59 | Technical survey, Component Project 3, NH38 section: Quan Goi – Yen Lenh (Km33+130 – Km52+827) – VRAM | Project Management Unit 3 – Directorate for Roads of Vietnam | Survey |
| 60 | Technical survey, Component Project 3, NH39-1 section: Trieu Duong – Hung Ha (Km42+714 – Km64+000) – VRAM | Project Management Unit 3 – Directorate for Roads of Vietnam | Survey |
| 61 | Technical survey, Component Project 3, NH48 section – Nghe An Province (Km 00 – Km 20 + Km 38 – Km 64) – VRAM | Project Management Unit 3 – Directorate for Roads of Vietnam | Survey |
| 62 | Preparation of construction investment projects for the Year 4 component projects – Road network maintenance component – WB4 Project | Project Management Unit 2 – Vietnam Road Administration | Feasibility study |
| 63 | Survey and design consultancy, NH56 project – Ba Ria Town bypass | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyDesign |
| 64 | Survey and design consultancy, Ba Ria Town bypass project – NH56, Ba Ria – Vung Tau Province. | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyDesign |
| 65 | Survey and investigation for Year 3.2 of the programme (topographic, hydrological, geotechnical, pavement and traffic volume surveys, plus support and study of related engineering issues) | Egis Bceom International | Survey |
| 66 | Survey consultancy and preparation of the design documents, NH55 bypass through An Nhut Commune, Long Dien District and Dat Do Township, Dat Do District | Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit | SurveyDesign |
| 67 | Survey consultancy, preparation of the construction drawing design and cost estimate: road from NH12C to the Formosa integrated steel complex, Ha Tinh Province | Ha Tinh Provincial Economic Zone Construction Investment Project Management Unit | SurveyConstruction drawings |
| 68 | Survey and design consultancy for the widening of NH51 through Ba Ria – Vung Tau Province | Bien Hoa – Vung Tau Expressway Development JSC | SurveyDesign |
| 69 | Survey and design, project for the upgrading and widening of NH55 through Ba Ria – Vung Tau Province | Transport Project Management Unit I | SurveyDesign |
| 70 | Survey and design, final section of NH51 (NH51B route) | Transport Project Management Unit I | SurveyDesign |
| 71 | Survey and design, project for the upgrading and widening of NH56 through Ba Ria – Vung Tau Province | Transport Project Management Unit I | SurveyDesign |
| 72 | NH14 western bypass road, Buon Ma Thuot City | Buon Ma Thuot City Projects Management Unit | — |
| 73 | Eastern North – South Expressway, 2017-2020 phase, Vinh Hao – Phan Thiet section | Project Management Unit 7 | — |
| 74 | Eastern North – South Expressway, 2017-2020 phase, Phan Thiet – Dau Giay section | Thang Long Project Management Unit | — |
| 75 | Survey and design of the Trung Luong – My Thuan Expressway (BOT project) | TEDI – Transport Engineering Design Incorporated, JSC | SurveyDesign |
| 76 | Survey and technical design with cost estimate, NH56 – Ba Ria Town bypass | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyTechnical design |
| 77 | NH55 bypass through An Ngai Commune (project) | Transport Project Management Unit II | — |
| 78 | Final section of NH51 | Transport Project Management Unit I | Investment policy |
| 79 | Survey and detailed planning design of the interchanges and service roads on NH56 | Ba Ria – Vung Tau Provincial Department of Transport | SurveyPlanningDesign |
| 80 | Survey and preparation of the construction investment project for the Ba Ria Town bypass – NH56, Ba Ria – Vung Tau Province. | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyFeasibility study |
| 81 | Topographic and geotechnical survey and preparation of the construction drawing design and cost estimate, Contract Package TV-08, widening of NH51 (km47-Km56) | Bien Hoa – Vung Tau Expressway Development JSC | SurveyConstruction drawings |
| 82 | NH14 western bypass road, Buon Ma Thuot City, Contract Package No. 03 (2007 scheme) | Buon Ma Thuot City Projects Management Unit | — |
| 83 | NH14 western bypass road, Buon Ma Thuot City, Contract Package No. 04 (2007 scheme) | Buon Ma Thuot City Projects Management Unit | — |
| 84 | Survey and construction drawing design, upgrading and widening of NH55 (Contract Package No. 1 – Km45+850 -:- Km52+305) | Ba Ria – Vung Tau Transport Works JSC | SurveyConstruction drawings |
| 85 | Rehabilitation and upgrading of NH56 through Ba Ria – Vung Tau Province (Contract Package 1: Km18+020 -:- Km23+600) | Transport Works Company 875 | — |
| 86 | Construction drawing design, final section of NH51 (former NH51B route), Contract Package No. 01 | Transport Project Management Unit I | Construction drawings |
| 87 | Survey and technical design, NH55, Lang Dai – Binh Thuan section | Transport Project Management Unit I | SurveyTechnical design |
| 88 | Construction drawing design for the upgrading of NH51B (Contract Package No. 3) | Dong Tam Co., Ltd | Construction drawings |
| 89 | Survey and technical design, NH56 (later section: Km18+020 -:- Km50+457) | Transport Project Management Unit I | SurveyTechnical design |
| 90 | Survey and project preparation, NH55, Lang Dai – Binh Thuan section | Transport Project Management Unit I | SurveyFeasibility study |
| 91 | Survey, technical design and cost estimate, and construction drawing design, Road 991B from NH51 to the downstream area of Cai Mep Port, ROAD SECTION (excluding the overpass at the NH51 interchange) | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyTechnical designConstruction drawings |
| 92 | Survey and construction drawing design, Phuoc Hoa – Cai Mep road, road section | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyConstruction drawings |
| 93 | Survey consultancy, technical design, construction drawing design and cost estimate for the stretch from Km16+200 to Km16+380 of inter-port road section 7 (Km15+561,31-Km17+271,13) | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyTechnical designConstruction drawings |
| 94 | Survey and construction drawing design, Cai Mep – Thi Vai inter-port road, Section 8 | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyConstruction drawings |
| 95 | Survey and technical design, Cai Mep – Thi Vai inter-port road, Section 8 | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyTechnical design |
| 96 | Construction drawing design – coastal road from Cua Lap Bridge to Lo Voi junction, Long Dien District | Long Dien District Construction Investment Project Management Unit | Construction drawings |
| 97 | Survey and project preparation, Road N4 around the shore of Xuyen Moc Lake | Xuyen Moc District Construction Investment Project Management Unit | Survey |
| 98 | Survey for the technical design stage, technical design and cost estimate, and construction drawing design, road and bridge from Go Gang to Long Son, section connecting to the Lang Cat – Long Son road | Transport Project Management Unit I | SurveyTechnical designConstruction drawings |
| 99 | Survey and preparation of the construction investment project for the rehabilitation and upgrading of the coastal road from Cua Lap Bridge to Lo Voi junction, Long Dien District | Long Dien District Construction Investment Project Management Unit | SurveyFeasibility study |
| 100 | Survey, technical design and cost estimate, Section 4 of the Cai Mep – Thi Vai inter-port road | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyTechnical design |
| 101 | Survey, technical design and construction drawing design, revised road from Go Gang Island to Long Son Island (following the change of scale) | Transport Project Management Unit I | SurveyTechnical designConstruction drawings |
| 102 | Survey and construction drawing design for the additional 22 kV power line, transformer station and lighting system, Dung Quat – Sa Huynh coastal road, My Khe – Tra Khuc section | Quang Ngai Provincial Department of Transport | SurveyConstruction drawings |
| 103 | Survey and project preparation, road and bridge from Go Gang to Long Son, section connecting to the Lang Cat – Long Son road | Transport Project Management Unit I | SurveyFeasibility study |
| 104 | Survey, technical design and cost estimate, alignment of Section 7 of the Cai Mep – Thi Vai inter-port road (Km15+561,31 -:- Km17+271,13) | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyTechnical design |
| 105 | Survey, technical design and cost estimate, road works of Section 6 of the Cai Mep – Thi Vai inter-port road | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyTechnical design |
| 106 | Survey, technical design and cost estimate, road works of Section 1 of the Cai Mep – Thi Vai inter-port road | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyTechnical design |
| 107 | Survey and construction drawing design, Section 3 (Km7+199,25 -:- Km9+612,64) of the Cai Mep – Thi Vai inter-port road project | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyConstruction drawings |
| 108 | Survey and project preparation, Road 991B from NH51 to the downstream area of Cai Mep Port, Tan Thanh District. | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyFeasibility study |
| 109 | Survey and project preparation, Phuoc Hoa – Cai Mep road, Tan Thanh District | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyFeasibility study |
| 110 | Survey and technical design, Section 3 (Km7+199,25 -:- Km9+612,64) of the Cai Mep – Thi Vai inter-port road | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyTechnical design |
| 111 | Topographic and geotechnical survey and project preparation for the alignment of the Cai Mep – Thi Vai inter-port road | Major Bridge and Tunnel Design Consultancy JSC | SurveyFeasibility study |
| 112 | Survey and construction drawing design, Dung Quat – Sa Huynh coastal road, My Khe – Tra Khuc section | Quang Ngai Provincial Department of Transport | SurveyConstruction drawings |
| 113 | Survey, technical design and construction drawing design, road from Go Gang Island to Long Son Island, Long Son Commune, Vung Tau City | Transport Project Management Unit I | SurveyTechnical designConstruction drawings |
| 114 | Survey, technical and construction design, Vung Tau – Binh Thuan (VT – BT) coastal road, Ben Loi – Binh Chau section (70 km) | Transport Project Management Unit I | SurveyTechnical design |
| 115 | Survey consultancy, preparation of the technical design and cost estimate documents, construction drawing design and building information modelling (BIM), project for the upgrading and widening of the Hoi Bai – Phuoc Tan road (PR.992) from NH51 to the Bien Hoa – Vung Tau Expressway | Cai Mep – Thi Vai Inter-port Road Project Management Unit | SurveyTechnical designConstruction drawings |
| 116 | Survey consultancy and construction design (including building information modelling, BIM), Provincial Road 991 extension project (from NH51 to the Cai Mep – Thi Vai inter-port road) | Cai Mep – Thi Vai Port Area Transport Project Management Unit | SurveyDesign |
| 117 | Survey consultancy and construction design following the basic design, project for the upgrading and widening of the Ba Ria – Chau Pha – Hac Dich road (PR.995B) | Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit | SurveyBasic design |
| 118 | Survey consultancy and construction design, project for the upgrading and widening of Provincial Road 328 (remaining section), Xuyen Moc District | Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit | SurveyDesign |
| 119 | Survey consultancy and construction design, project for the upgrading of Provincial Road 44B within Long Dien District and Dat Do District | Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit | SurveyDesign |
| 120 | Survey consultancy and construction design, project for the rehabilitation and upgrading of the Minh Dam mountainside road from PR.44A beside the Thuy Duong tourist resort to Long Phu junction, Phuoc Hai Township, Dat Do District | Dat Do District Construction Investment Project Management Unit | SurveyDesign |
| 121 | Survey and design consultancy, Provincial Road 44B (section from Bau Ong Dan junction to Provincial Road 52) | Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit | SurveyDesign |
| 122 | Survey and design consultancy, project for the rehabilitation and upgrading of the Minh Dam mountainside road from PR.44A beside the Thuy Duong tourist resort to Long Phu junction, Phuoc Hai Township, Dat Do District. | Dat Do District Construction Investment Project Management Unit | SurveyDesign |
| 123 | Survey and design consultancy, Thong Nhat Road (extension), Wards 1 and 3 and Thang Tam Ward, Vung Tau City | Vung Tau City Construction Investment Project Management Unit No. 1 | SurveyDesign |
| 124 | Survey and design consultancy, Planned Road AIII, Ward 12, Vung Tau City | Vung Tau City Construction Investment Project Management Unit No. 1 | SurveyDesign |
| 125 | Survey and design consultancy, Planned Road P (sections 1 and 2, from Road 13 to Planned Road 33), Phu My Township | Tan Thanh District Construction Investment Project Management Unit | SurveyDesign |
| 126 | Survey and design consultancy for the upgrading and widening of Provincial Road 328, Xuyen Moc District | Transport Project Management Unit II | SurveyDesign |
| 127 | Survey and design consultancy, 30/4 Road project from Chi Linh junction to Eo Ong Tu, Vung Tau City | Transport Project Management Unit I | SurveyDesign |
| 128 | Survey and design consultancy, Binh Ba – Da Bac – Phuoc Tan road project (Hoi Bai – Chau Pha – Da Bac – Phuoc Tan road, phase 2) | Transport Project Management Unit II | SurveyDesign |
| 129 | Survey and design consultancy, Phuoc Hai – Dat Do road project | Dat Do Construction Investment Project Management Unit | SurveyDesign |
| 130 | Survey and design consultancy, Hang Dieu Road project (section from 30/4 Road to Road 51C), Vung Tau City | Vung Tau City Construction Investment Project Management Unit No. 1 | SurveyDesign |
| 131 | Survey and design consultancy, investment project for the upgrading of the Lang Cat – Long Son road (Hoang Sa Road) | Ba Ria – Vung Tau Provincial Specialised Transport Project Management Unit | SurveyDesign |
| 132 | Survey consultancy, design and BIM management model, project: Nguyen Phong Sac Road, Vung Tau City. | Ba Ria – Vung Tau Provincial Specialised Transport and Civil Works Project Management Unit | SurveyDesign |
| 133 | Survey and design consultancy, Planned Road D13, Residential Area No. 9 (western branch of Road S), Phu My Town, Ba Ria – Vung Tau Province | Phu My Town Construction Investment Project Management Unit | SurveyDesign |
| 134 | Survey and design consultancy, Binh Gia Road project (section from 30/4 Road to the connection with 2/9 Road), Vung Tau City | Vung Tau City Construction Investment Project Management Unit No. 2 | SurveyDesign |
| 135 | Survey and design consultancy, project for the rehabilitation and upgrading of Road 965, Phu My Town | Cai Mep – Thi Vai Port Area Transport Project Management Unit | SurveyDesign |
| 136 | Survey and construction drawing design, rehabilitation and upgrading of the Minh Dam mountainside road from PR.44 beside the Thuy Duong tourist resort to Long Phu junction, Phuoc Hai Township, Dat Do District (phase 1) | Dat Do District Construction Investment Project Management Unit | SurveyConstruction drawings |
| 137 | Survey and construction drawing design, Provincial Road 52 through the centre of Long Tan Commune, Dat Do District (Km31+900 -:- Km32+947 and Km37+340 -:- Km37+880) | Dat Do District Construction Investment Project Management Unit | SurveyConstruction drawings |
| 138 | Planned Road P (sections 1 and 2, from Road 13 to Planned Road 33), Phu My Township | Tan Thanh District Construction Investment Project Management Unit | Investment policy |
| 139 | Provincial Road 328 (project) | Transport Project Management Unit II | — |
| 140 | Survey and re-preparation of the construction investment project for Nguyen Tat Thanh Road (extension of Planned Road No. 02), Ba Ria Town | Ba Ria Town Construction Investment Project Management Unit | SurveyFeasibility study |
| 141 | Survey and re-preparation of the construction investment project for Rural Road 10, Ba Ria Town | Ba Ria Town Construction Investment Project Management Unit | SurveyFeasibility study |
| 142 | Survey and technical design; survey and construction drawing design, 30/4 Road from Chi Linh junction to Eo Ong Tu, Vung Tau City | Transport Project Management Unit I | SurveyTechnical designConstruction drawings |
| 143 | Construction drawing design, Planned Road No. 7, Long Hai Township, Long Dien District | Long Dien District Construction Investment Project Management Unit | Construction drawings |
| 144 | Survey and preparation of the construction investment project for Planned Road No. 7, Long Hai Township, Long Dien District (Section 1) | Long Dien District Construction Investment Project Management Unit | SurveyFeasibility study |
| 145 | Revised design of the patrol trail combined with eco-tourism, Con Dao National Park | Con Dao National Park Management Board | Design |
| 146 | Survey and construction drawing design, Hai Lam – Bau Tru road, Long Dien District | Long Dien District Construction Investment Project Management Unit | SurveyConstruction drawings |
| 147 | Survey and construction drawing design, Binh Ba – Da Bac – Phuoc Tan road (Hoi Bai – Chau Pha – Da Bac – Phuoc Tan road, phase 2) | Transport Project Management Unit II | SurveyConstruction drawings |
| 148 | Survey and construction drawing design, Planned Road No. 02, Phuoc Buu, Xuyen Moc District | Xuyen Moc District Construction Investment Project Management Unit | SurveyConstruction drawings |
| 149 | Survey and construction drawing design, Phuoc Hai – Dat Do road | Dat Do District Construction Investment Project Management Unit | SurveyConstruction drawings |
| 150 | Survey and construction drawing design, Planned Road No. 9, Long Hai, Long Dien District | Long Dien District Construction Investment Project Management Unit | SurveyConstruction drawings |
| 151 | Topographic, geotechnical and pavement-subgrade survey and preparation of the investment project for 30/4 Road from Chi Linh junction to Eo Ong Tu, Vung Tau City | Transport Project Management Unit I | SurveyFeasibility study |
| 152 | Topographic and geotechnical survey and construction drawing design, Planned Road No. 4, section 2, Phuoc Buu Township, Xuyen Moc District | Xuyen Moc District Construction Investment Project Management Unit | SurveyConstruction drawings |
| 153 | Survey and construction drawing design, revised Contract Package No. 03 (subgrade, pavement and stormwater drainage over Km10 -Km11, Km11+400 -:- Km13+100 and Km13+650 -:- Km13+954,04), Western Ring Road, Buon Ma Thuot City (2010) | Buon Ma Thuot City Projects Management Unit | SurveyConstruction drawings |
| 154 | Survey and preparation of the investment project for the Phuoc Hai – Dat Do road | Dat Do District Construction Investment Project Management Unit | SurveyFeasibility study |
| 155 | Survey and construction drawing design, revised Contract Package No. 03, Western Ring Road, Buon Ma Thuot City (2009) | Buon Ma Thuot City Projects Management Unit | SurveyConstruction drawings |
| 156 | Survey and construction drawing design, revised Contract Package No. 04, Western Ring Road, Buon Ma Thuot City (2009) | Buon Ma Thuot City Projects Management Unit | SurveyConstruction drawings |
| 157 | Survey and construction drawing design, Planned Road No. 2 (phase 1), Phuoc Hai Township, Dat Do District | Dat Do District Construction Investment Project Management Unit | SurveyConstruction drawings |
| 158 | Construction drawing design for the upgrading of Ngo Quyen Road, Ward 10, Vung Tau City | Vung Tau City Construction Investment Project Management Unit | Construction drawings |
| 159 | Construction drawing design, Road D10, Ward 10, Vung Tau City | Ba Ria – Vung Tau Provincial Land Fund Development Centre | Construction drawings |
| 160 | Survey and construction drawing design, Phuoc Hai – Loc An road, Phuoc Hai Commune, Dat Do | Dat Do District Construction Investment Project Management Unit | SurveyConstruction drawings |
| 161 | Construction drawing design, Planned Road No. 2, Phuoc Long Tho Commune, Dat Do District | Dat Do District Construction Investment Project Management Unit | Construction drawings |
| 162 | Construction drawing design, Planned Road No. 3, Phuoc Long Tho Commune | Dat Do District Construction Investment Project Management Unit | Construction drawings |
| 163 | Survey and preparation of the investment project for Planned Road N1, Chi Linh – Cua Lap tourist area, Vung Tau City | Vung Tau City Construction Investment Project Management Unit | SurveyFeasibility study |
| 164 | Survey and preparation of the investment project for Planned Road B2, Chi Linh – Cua Lap tourist area, Vung Tau City | Vung Tau City Construction Investment Project Management Unit | SurveyFeasibility study |
| 165 | Investment project for the road up Nui Lon, Vung Tau City | Transport Project Management Unit II | Feasibility study |
| 166 | Survey and construction drawing design, Provincial Road 52 through the Dat Do District town centre | Dat Do District Construction Investment Project Management Unit | SurveyConstruction drawings |
| 167 | Revised technical design, Chi Linh Road (Nguyen Huu Canh) | Transport Project Management Unit I | Technical design |
| 168 | Technical design, North – South Axis Road No. 3 (Loc An – Suoi Rao road), Ba Ria – Vung Tau Province | Transport Project Management Unit I | Technical design |
| 169 | Construction drawing design, Planned Road No. 14, Kim Dinh Ward, Ba Ria Town | Ba Ria Town Construction Investment Project Management Unit | Construction drawings |
| 170 | Investment project for the rehabilitation and upgrading of the Minh Dam mountainside road from PR.44 beside the Thuy Duong tourist resort to Long Phu junction, Loc An Commune (basic design appraisal already obtained) | Dat Do District Construction Investment Project Management Unit | Feasibility study |
| 171 | Survey and preparation of the investment project for Provincial Road 52 through the Dat Do District town centre | Dat Do District Construction Investment Project Management Unit | SurveyFeasibility study |
| 172 | Economic-technical report, road from Mr Hoai's land to Lo O, Phuoc Long Tho, continuing to Bau Beo (the former Bau Beo road) | Dat Do District Construction Investment Project Management Unit | Econ.-technical report |
| 173 | Technical design for the upgrading of the eco-tourism trail system, Con Dao National Park | Con Dao National Park Management Board | Technical design |
| 174 | Survey, project preparation and technical and construction design for the rehabilitation and upgrading of Rural Road 3, Ba Ria Town | Ba Ria Town Construction Investment Project Management Unit | SurveyFeasibility studyTechnical designConstruction drawings |
| 175 | Survey, project preparation and technical and construction design for the rehabilitation and upgrading of Rural Road 8, Ba Ria Town | Ba Ria Town Construction Investment Project Management Unit | SurveyFeasibility studyTechnical designConstruction drawings |
| 176 | Technical design, Chau Pha – Phuoc Tan road (branch 2) | Transport Project Management Unit I | Technical design |
| 177 | North – South main road (phase 3), Long Dat District (replaced by a red-gravel rural road from NH55 to Chan Tien Mountain, An Ngai Commune) | Long Dien District Construction Investment Project Management Unit | — |
| 178 | Design of Planned Road No. 2, Phuoc Buu Township, Xuyen Moc District | Xuyen Moc District Construction Investment Project Management Unit | Design |
| 179 | Provincial Road 44B – phase 2, Long Dat District | Long Dien District Construction Investment Project Management Unit | — |
| 180 | Project for the tourist jetties at Hon Cau and Hon Bay Canh and the eco-tourism trails of Con Dao National Park (trail system, plus the tourist jetties at Hon Cau and Hon Bay Canh) | Con Dao National Park Management Board | — |
| 181 | Project preparation and technical design, Planned Road No. 5 (Road 328 extension to Xom Ray) | Xuyen Moc District Construction Investment Project Management Unit | Feasibility studyTechnical design |
| 182 | Survey and technical design, access road to the Nui Dinh tourist area (Package 1) | Transport Project Management Unit I | SurveyTechnical design |
| 183 | Technical design, ring road adjoining the provincial Administrative and Political Centre | Project Management Unit of the Ba Ria – Vung Tau Provincial Department of Construction | Technical design |
| 184 | Technical design, Planned Road No. 11 (section linking NH56 and Rural Road 10), Ba Ria Town | Ba Ria Town Construction Investment Project Management Unit | Technical design |
| 185 | Project for the ring road adjoining the Administrative and Political Centre | Project Management Unit of the Ba Ria – Vung Tau Provincial Department of Construction | — |
| 186 | Survey and design, Rural Transport Project 2, Ba Ria – Vung Tau Province (48.8 km) – Class VI road) | Transport Project Management Unit I | SurveyDesign |
| 187 | Upgrading of Le Loi Road, Vung Tau City | Transport Project Management Unit I | — |
| 188 | Supervision consultancy for the management and maintenance of the bridge, road and inland waterway network in the province | Ba Ria – Vung Tau Provincial Department of Transport | Construction supervision |
| 189 | Supervision consultancy for the management and maintenance of the bridge, road and waterway network in Ba Ria – Vung Tau Province, 2012-2018 period | Ba Ria – Vung Tau Provincial Department of Transport | Construction supervision |
| 190 | Supervision of the annual management and maintenance of the traffic signal system in Ba Ria – Vung Tau Province, 2012-2018 period | Ba Ria – Vung Tau Provincial Department of Transport | Construction supervision |
| 191 | Supervision of localised repairs to the subgrade and pavement over Km5+500 -:- Km6+750; Km8+900 -:- Km9+000; Km38+000 -:- Km41+000 on NH55, Ba Ria – Vung Tau Province | Ba Ria – Vung Tau Provincial Department of Transport | Construction supervision |
| 192 | Supervision of the 2013 installation of traffic signals, flashing amber lights in the districts and road signs across the province | Ba Ria – Vung Tau Provincial Department of Transport | Construction supervision |
| 193 | Supervision of the installation of bus stops and shelters | Ba Ria – Vung Tau Provincial Department of Transport | Construction supervision |
| 194 | Provision of survey services; construction drawing design; preparation of the total cost estimate; preparation of bidding documents and evaluation for the selection of the construction contractor; and construction supervision for all works on the road connecting to the SP-SSA international container terminal internal road | Saigon Port – SSA International Container Services Joint Venture | SurveyConstruction drawingsConstruction supervision |
| 195 | Supervision of filling works in the Interflour area, phase II, and part C of the additional 20.6 ha lease area, Cai Mep Industrial Park | Saigon Construction Corporation | Construction supervision |
| 196 | Upgrading and widening of NH56 through Ba Ria – Vung Tau Province | Ba Ria – Vung Tau Provincial Transport Project Management Unit | Construction supervision |
| 197 | Supervision of repairs to Vo Thi Sau Road, Long Dien District | Ba Ria – Vung Tau Provincial Department of Transport | Construction supervision |
| 198 | Supervision of the 2014 management and maintenance of the traffic signal system | Ba Ria – Vung Tau Provincial Department of Transport | Construction supervision |
| 199 | Supervision of the 2014 management and maintenance of the road and bridge network in Ba Ria – Vung Tau Province | Ba Ria – Vung Tau Provincial Department of Transport | Construction supervision |
| 200 | Supervision of the 2013 management and maintenance of the road and bridge network in Ba Ria – Vung Tau Province | Ba Ria – Vung Tau Provincial Department of Transport | Construction supervision |
| 201 | Supervision of the 2012 management and maintenance of the road transport network | Ba Ria – Vung Tau Provincial Department of Transport | Construction supervision |
| 202 | Contract package (No. 10) for testing during the trial construction stage, project for the rehabilitation and upgrading of Road 965, Phu My Town | Cai Mep – Thi Vai Port Area Transport Project Management Unit | Testing & inspection |
| 203 | Testing during trial construction, Cai Mep – Thi Vai inter-port road, Section 8 | Cai Mep – Thi Vai Inter-port Road Project Management Unit | Testing & inspection |
| 204 | Testing on the Cai Mep – Thi Vai inter-port road, Section 8, construction contract package 24 (Km17+271,13-Km17+690,85), items: ground treatment and subgrade | Ha Noi Construction JSC | Testing & inspection |
| 205 | Testing on the Cai Mep – Thi Vai inter-port road, Section 7, trial construction | Cai Mep – Thi Vai Inter-port Road Project Management Unit | Testing & inspection |
| 206 | Quality testing for the contract package covering pavement construction and technical infrastructure along the route, Cai Mep – Thi Vai inter-port road project, Section 4 (Km9+612,64 -:- Km11+698,78) | Road and Bridge Construction Division 1 – Civil Engineering Construction Corporation No. 8 | Testing & inspection |
| 207 | Construction quality testing for the subgrade, removal of organic soil, geotextile laying and sand filling items, Cai Mep – Thi Vai inter-port road, Section 7 (Km15+651,31 -:- Km17+272,13) | Chien Thang Construction Co., Ltd | Testing & inspection |
| 208 | Works quality testing, Cai Mep – Thi Vai inter-port road, Section 1 – construction contract package 02, item: subgrade from Km0+800 -:- Km1+300, ground treatment using cement deep soil mixing columns (full-scale construction stage) | Chau Thanh Transport and Urban Construction JSC | Testing & inspection |
| 209 | Construction quality testing for the cement deep soil mixing column item, full-scale construction stage, Cai Mep – Thi Vai inter-port road, Section 1, construction contract package 03 (Km1+300 -:- Km1+898,03) | Dong Nam Construction Co., Ltd | Testing & inspection |
| 210 | Construction quality testing, Contract Package No. 09: construction of the stretch from Km0+00 -:- Km1+437,53, NH56 project – Ba Ria Town bypass | Ho Chi Minh City branch of IDICO Petroleum Construction Investment JSC | Testing & inspection |
| 211 | Construction quality testing for the subgrade item (excluding testing of cement soil columns), full-scale construction stage, Cai Mep – Thi Vai inter-port road, Section 3, construction contract package 02 (Km8+800 -:- Km1+300) | Ba Ria – Vung Tau Transport Works JSC | Testing & inspection |
| 212 | Construction quality testing for the subgrade item (excluding testing of cement soil columns), full-scale construction stage, Cai Mep – Thi Vai inter-port road, Section 1, construction contract package 02 (Km0+800 -:- Km1+300) | Ba Ria – Vung Tau Transport Works JSC | Testing & inspection |
| 213 | Testing during the trial construction stage, Cai Mep – Thi Vai inter-port road, Section 1 (Km0+000 -:- Km1+898,03) | Cai Mep – Thi Vai Inter-port Road Project Management Unit | Testing & inspection |
| 214 | Testing during the trial construction stage, Cai Mep – Thi Vai inter-port road, Section 6 | Cai Mep – Thi Vai Inter-port Road Project Management Unit | Testing & inspection |
| 215 | Construction quality testing for the subgrade item (excluding testing of cement soil columns), full-scale construction stage, Cai Mep – Thi Vai inter-port road, Section 1, construction contract package 03 (Km1+300 -:- Km1+898,03) | Dong Nam Construction Co., Ltd | Testing & inspection |
| 216 | Construction quality testing for the subgrade item and for ground treatment using cement deep soil mixing columns, full-scale construction stage, Cai Mep – Thi Vai inter-port road, Section 6 (Km14+424,98 -:- Km15+561,31), construction contract package 02 | 886 – Thanh Nam Construction Investment JSC | Testing & inspection |
| 217 | Quality testing on the Cai Mep – Thi Vai inter-port road, Section 3 – package 1 (Km7+199,25 -:- Km8+800), cement deep soil mixing column item, full-scale construction stage | Airport Construction Single-Member Co., Ltd – ACC | Testing & inspection |
| 218 | Construction quality inspection testing, Contract Package No. 01 (Km7+199,25 -:- Km8+800), Cai Mep – Thi Vai inter-port road, Section 3 (subgrade works). | Road and Bridge Division – Ba Ria – Vung Tau Urban Construction and Development JSC | Testing & inspection |
| 219 | Quality testing on the Cai Mep – Thi Vai inter-port road, Section 3 – package 1, cement deep soil mixing column item, trial construction stage | Airport Construction Single-Member Co., Ltd – ACC | Testing & inspection |
| 220 | Quality testing for the subgrade item, Cai Mep – Thi Vai inter-port road, Section 3, construction contract package 02 | Ba Ria – Vung Tau Transport Works JSC | Testing & inspection |
| 221 | Quality inspection testing of transport works, Contract Package No. 05b (Km83+400 -:- Km84+767,5), rehabilitation and upgrading of the final section of NH51 | Ba Ria – Vung Tau Transport Works JSC | Testing & inspection |
| 222 | Construction quality inspection testing, Contract Package No. 05a (Km82+030 -:- Km83+400), rehabilitation and upgrading of NH51 | Road and Bridge Division – Ba Ria – Vung Tau Urban Construction and Development JSC | Testing & inspection |
| 223 | Construction quality inspection testing, Contract Package No. 12 (Km0+00 -:- Km4+500), upgrading of the Hoi Bai – Chau Pha – Da Bac – Phuoc Tan road (phase 1) | Road and Bridge Division – Ba Ria – Vung Tau Urban Construction and Development JSC | Testing & inspection |
| 224 | Construction quality inspection testing for the stretch Km10+471,49 -:- Km13+550,95 within Contract Package No. 14 (Km9+00 -:- Km13+550,95), upgrading of the Hoi Bai – Chau Pha – Da Bac – Phuoc Tan road (phase 1) | Tan Thanh Construction Investment and Manufacturing JSC | Testing & inspection |