{"id":989,"date":"2026-11-03T06:15:54","date_gmt":"2026-11-02T23:15:54","guid":{"rendered":"https:\/\/tuvangiaothong.bzz.vn\/fields-of-activity\/industrial-urban-infrastructure\/"},"modified":"2026-11-03T06:22:17","modified_gmt":"2026-11-02T23:22:17","slug":"industrial-urban-infrastructure","status":"publish","type":"page","link":"https:\/\/tuvangiaothong.com\/en\/fields-of-activity\/industrial-urban-infrastructure\/","title":{"rendered":"Infrastructure for Industrial Parks &#038; Urban Areas"},"content":{"rendered":"<p><!-- Trang l\u0129nh v\u1ef1c v\u00f2ng 5 (g\u00f3p \u00fd kh\u00e1ch 30\/10, m\u1ee5c 2.1, 02\/11\/2026). Ch\u1eef theo b\u1ea3n kh\u00e1ch d\u1ef1ng tvgtweb.web.app; b\u1ea3ng = g\u1ed9p c\u00e1c d\u00f2ng c\u1ee7a 7 trang l\u0129nh v\u1ef1c c\u0169 + d\u1ef1 \u00e1n m\u1edbi c\u00f3 trong b\u1ea3n \u0111\u00f3. H\u1ed3 s\u01a1: \/data\/kho\/tuvangiaothong\/2026-10-30\/vong5\/linhvuc\/ --> <\/p>\n<div class=\"tdc-lv5\">\n<div class=\"tdc-lv5__mo\">\n<div class=\"tdc-lv5__nd\">\n<h2>Scope of activities<\/h2>\n<ul>\n<li>Industrial parks and clusters of several hundred hectares<\/li>\n<li>Soft-ground treatment with vertical drains and vacuum consolidation<\/li>\n<li>Small-industry zones receiving relocated workshops<\/li>\n<li>Resettlement areas and concentrated residential areas<\/li>\n<li>Tourism zones and resorts with a 36-hole golf course<\/li>\n<li>Service, commercial and cargo-inspection centres<\/li>\n<li>Grading platforms, internal roads, drainage, street lighting<\/li>\n<li>Detailed 1\/500 planning; supervision of filling and resettlement works<\/li>\n<\/ul>\n<\/div>\n<div class=\"tdc-lv5__bai\">\n<p>TDC&#39;s portfolio in this field ranges from industrial parks of 760 ha, 823 ha and 1,000 ha in Ba Ria \u2013 Vung Tau and Dong Nai, through resettlement areas, residential areas and small-industry zones for relocated workshops, to a 1,000 ha tourism complex in Binh Thuan with a 36-hole golf cluster. In many sites the first problem is soft ground: at one industrial park in Cai Mep, the ground-treatment scheme was changed from sand piles with surcharge to vertical drains with vacuum consolidation.<\/p>\n<h3>Scale and types of development<\/h3>\n<ul>\n<li>Industrial parks, industrial clusters, service centres and commercial\u2013service areas that support industrial parks.<\/li>\n<li>Resettlement areas, residential areas, and small-industry zones that take in workshops relocated from polluted areas.<\/li>\n<li>Tourism zones and complexes with golf courses; a centralised cargo-inspection centre.<\/li>\n<\/ul>\n<h3>Ground and on-site works<\/h3>\n<ul>\n<li>Topographic and geological survey; design of soft-ground treatment (vertical drains, vacuum consolidation).<\/li>\n<li>Design of grading platforms, internal roads, pavements, landscaping, stormwater and wastewater drainage and street lighting.<\/li>\n<li>Detailed planning at 1\/500 scale; basic design, construction drawings and total cost estimates.<\/li>\n<\/ul>\n<h3>Supervision<\/h3>\n<ul>\n<li>Supervision of site filling and on-site works in industrial parks and resettlement areas.<\/li>\n<\/ul>\n<h3>Experience and capability<\/h3>\n<p>TDC has taken part in the design of the Cai Mep, Dat Do I, Ong Keo and Xuan Que \u2013 Song Nhan industrial parks, the Song Thao industrial cluster and the NovaWorld Phan Thiet complex (about 1,000 ha).<\/p>\n<\/div><\/div>\n<h2 class=\"tdc-lv5__bang-td\" id=\"du-an\">Completed projects<\/h2>\n<table class=\"tdc-lv5__bang\">\n<thead>\n<tr>\n<th class=\"tdc-lv5__stt\">No.<\/th>\n<th>Project name<\/th>\n<th>Project owner<\/th>\n<th class=\"tdc-lv5__gd\">Stage of involvement<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr data-gd=\"nckt\">\n<td class=\"tdc-lv5__stt\">1<\/td>\n<td>Renovation of the main drainage canal of Vung Tau City (2025)<\/td>\n<td>PMB 9 \u2013 HCMC Urban Infrastructure Board<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">2<\/td>\n<td>Drainage canal from planned road B2 to Thi Vai stream, My Xuan Ward, Phu My City (2025)<\/td>\n<td>Phu My Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">3<\/td>\n<td>Priority infrastructure and climate-resilient urban development of Ha Tinh City \u2013 Package 14.BVTC (item 1.2 Hao Thanh and 3.3 Nguyen Trung Thien Street) (2025)<\/td>\n<td>Ha Tinh Province Transport Works and Urban Development Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">4<\/td>\n<td>Route N9 (sections D2+D4), technical infrastructure of Dat Do 1 Industrial Park (updated cost estimate) (2025)<\/td>\n<td>Tin Nghia \u2013 Phuong Dong Industrial Park JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt bvtc\">\n<td class=\"tdc-lv5__stt\">5<\/td>\n<td>Upgrading of the stormwater drainage system on Nguyen An Ninh Street (from Thuy Van to Nguyen Thi Minh Khai), Vung Tau City (2024)<\/td>\n<td>Tam Thang Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bcktkt\">\n<td class=\"tdc-lv5__stt\">6<\/td>\n<td>Wastewater drainage system on Le Hong Phong Street (from Thuy Van to Nguyen Thi Minh Khai), Vung Tau City (2024)<\/td>\n<td>Tam Thang Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Econ.-technical report<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">7<\/td>\n<td>Main drainage line along National Road 51 (from Road 46 to the Phuoc Hoa \u2013 Cai Mep road) \u2013 component 02 (2020)<\/td>\n<td>Project Steering Board 12 \u2013 HCMC Transport Board<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">8<\/td>\n<td>Technical infrastructure for the residential area along the Bau Giang \u2013 Cau Moi corridor (main roads, concrete roads, pavements, landscaping, power supply and lighting systems)<\/td>\n<td>Quang Ngai Provincial Construction Investment Projects Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">9<\/td>\n<td>Survey and preparation of the construction investment project for the Bau Bang residential and resettlement area, Xuyen Moc District<\/td>\n<td>Xuyen Moc District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">10<\/td>\n<td>Technical infrastructure, Minh Dam mountain tourist area<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt bvtc\">\n<td class=\"tdc-lv5__stt\">11<\/td>\n<td>Consultancy for the preparation of the feasibility study report; construction drawing design and construction cost estimate of the technical infrastructure works for the Xuan Que \u2013 Song Nhan Industrial Park infrastructure construction investment and business project (phase 1) in Xuan Que Commune, Dong Nai Province. Total area: 1,000 ha<\/td>\n<td>Xuan Que Industrial Park JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tk\">\n<td class=\"tdc-lv5__stt\">12<\/td>\n<td>Technical infrastructure design consultancy, Ocean Valley complex project (NOVAWORLD PHAN THIET). Total area: 1,000 ha, including a 36-hole golf cluster<\/td>\n<td>DELTA \u2013 VALLEY Binh Thuan Co., Ltd<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkcs bvtc\">\n<td class=\"tdc-lv5__stt\">13<\/td>\n<td>Survey, basic design and construction drawing design of the technical infrastructure of Ong Keo Industrial Park, Phuoc Khanh Commune, Nhon Trach District, Dong Nai Province. Total area: 823 ha<\/td>\n<td>Tin Nghia Corporation<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Basic design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">14<\/td>\n<td>Survey consultancy and construction drawing design of the technical infrastructure, Northern Zone, Cai Mep Industrial Park, Tan Thanh District. Total area: 760 ha<\/td>\n<td>Saigon Construction Corporation<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkcs bvtc\">\n<td class=\"tdc-lv5__stt\">15<\/td>\n<td>Geotechnical survey, basic design, construction drawing design and total cost estimate for the technical infrastructure of Dat Do I Industrial Park. Total area: 500 ha<\/td>\n<td>Tin Nghia \u2013 Phuong Dong Industrial Park JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Basic design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">16<\/td>\n<td>Survey, construction drawing design and cost estimate for the technical infrastructure of the Dat Do I residential area. Total area: 100 ha<\/td>\n<td>Tin Nghia \u2013 Phuong Dong Industrial Park JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">17<\/td>\n<td>Construction drawing design of the technical infrastructure system, Phase I, Area I, residential area at Dong Dai Mountain, Phuoc Tan Commune, Bien Hoa City, Dong Nai Province. Total area: 156 ha<\/td>\n<td>Phuoc Tan Trading and Construction JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks qh\">\n<td class=\"tdc-lv5__stt\">18<\/td>\n<td>Topographic and geotechnical survey and preparation of the 1\/500 plan for the Dat Do I residential area project, Phuoc Long Tho Commune, Dat Do District<\/td>\n<td>Tin Nghia \u2013 Phuong Dong Industrial Park JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Planning<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">19<\/td>\n<td>Construction drawing design of the technical infrastructure works, Long Son resettlement area<\/td>\n<td>Transport Project Management Unit II<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">20<\/td>\n<td>Survey and preparation of the investment project for the technical infrastructure of the Long Son resettlement area, Vung Tau City<\/td>\n<td>Transport Project Management Unit II<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">21<\/td>\n<td>Planning consultancy, construction drawing design and cost estimate for the Centralised Goods Inspection Centre<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Customs Department<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tkcs bvtc\">\n<td class=\"tdc-lv5__stt\">22<\/td>\n<td>Checking of the topographic survey records; preparation of the geotechnical and hydrological survey report; basic design and construction drawing design of the technical infrastructure of Song Thao Industrial Cluster<\/td>\n<td>Tin Nghia Corporation<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Basic design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkcs bvtc\">\n<td class=\"tdc-lv5__stt\">23<\/td>\n<td>Survey, basic design, construction drawing design and cost estimate for the technical infrastructure of the commercial, service and residential area serving Tan Phu Industrial Park<\/td>\n<td>Tin Nghia Corporation<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Basic design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">24<\/td>\n<td>Preparation of the construction drawing design and total cost estimate for the service centre area of Bau Xeo Industrial Park, Trang Bom District, Dong Nai Province<\/td>\n<td>Thong Nhat JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkcs bvtc\">\n<td class=\"tdc-lv5__stt\">25<\/td>\n<td>Survey, basic design and construction drawing design of the technical infrastructure of Ong Keo Industrial Park, Phuoc Khanh Commune, Nhon Trach District, Dong Nai Province. Contract appendix of 02\/2015 (ground treatment: vacuum consolidation design method applied, ..)<\/td>\n<td>Tin Nghia Corporation<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Basic design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">26<\/td>\n<td>Survey consultancy and construction drawing design of the technical infrastructure, Northern Zone, Cai Mep Industrial Park, Tan Thanh District. Contract appendix (adjustment of the value of economic contract 21.07\/TCT.H\u0110KT \u2013 change of the ground treatment method from sand piles with surcharge preloading to vacuum consolidation with prefabricated vertical drains)<\/td>\n<td>Saigon Construction Corporation<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">27<\/td>\n<td>Survey and technical and construction design of the technical infrastructure of the Bau Sen Lake park area<\/td>\n<td>Vung Tau City Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt\">\n<td class=\"tdc-lv5__stt\">28<\/td>\n<td>Investment project for the technical infrastructure of the Hoa Anh Dao planning area<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">29<\/td>\n<td>Supervision consultancy, technical infrastructure of Phuoc Thang small-scale industrial zone for the relocation of polluting small-scale industrial facilities in Vung Tau City<\/td>\n<td>Vung Tau City Construction Investment Project Management Unit No. 1<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">30<\/td>\n<td>Supervision consultancy for construction and equipment installation, North-West resettlement area along Road AIII (technical infrastructure), Ward 12, Vung Tau City<\/td>\n<td>Vung Tau City Construction Investment Project Management Unit No. 1<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">31<\/td>\n<td>Supervision of the construction of the technical infrastructure, Cai Mep Industrial Park technical infrastructure construction investment and business project<\/td>\n<td>Saigon Construction Corporation<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">32<\/td>\n<td>Supervision of the expansion of the resettlement area east of NH56, Ba Ria City<\/td>\n<td>Ba Ria City Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">33<\/td>\n<td>Supervision of site levelling works on lot XL3, Northern Zone, technical infrastructure of Cai Mep Industrial Park<\/td>\n<td>Saigon Construction Corporation<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">34<\/td>\n<td>Supervision of site levelling works on lot XL3, Southern Zone, technical infrastructure of Cai Mep Industrial Park<\/td>\n<td>Saigon Construction Corporation<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tnkd\">\n<td class=\"tdc-lv5__stt\">35<\/td>\n<td>Geotechnical survey for the BIDV headquarters building at 72A Tran Hung Dao, Vung Tau City<\/td>\n<td>BIDV Vietnam \u2013 Southern Investment Projects Works Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Industrial parks, industrial clusters, resettlement and residential areas and tourism zones of up to 1,000 ha \u2013 soft-ground treatment, site grading, internal road networks, drainage and power supply.<\/p>\n","protected":false},"author":0,"featured_media":367,"parent":457,"menu_order":13,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-989","page","type-page","status-publish","has-post-thumbnail","hentry","description-off"],"_links":{"self":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/989","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/types\/page"}],"replies":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/comments?post=989"}],"version-history":[{"count":0,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/989\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/457"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/media\/367"}],"wp:attachment":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/media?parent=989"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}