{"id":987,"date":"2026-11-03T06:15:53","date_gmt":"2026-11-02T23:15:53","guid":{"rendered":"https:\/\/tuvangiaothong.bzz.vn\/fields-of-activity\/roads-highways\/"},"modified":"2026-11-03T06:22:16","modified_gmt":"2026-11-02T23:22:16","slug":"roads-highways","status":"publish","type":"page","link":"https:\/\/tuvangiaothong.com\/en\/fields-of-activity\/roads-highways\/","title":{"rendered":"Roads &#038; Highways"},"content":{"rendered":"<p><!-- Trang l\u0129nh v\u1ef1c v\u00f2ng 5 (g\u00f3p \u00fd kh\u00e1ch 30\/10, m\u1ee5c 2.1, 02\/11\/2026). Ch\u1eef theo b\u1ea3n kh\u00e1ch d\u1ef1ng tvgtweb.web.app; b\u1ea3ng = g\u1ed9p c\u00e1c d\u00f2ng c\u1ee7a 7 trang l\u0129nh v\u1ef1c c\u0169 + d\u1ef1 \u00e1n m\u1edbi c\u00f3 trong b\u1ea3n \u0111\u00f3. H\u1ed3 s\u01a1: \/data\/kho\/tuvangiaothong\/2026-10-30\/vong5\/linhvuc\/ --> <\/p>\n<div class=\"tdc-lv5\">\n<div class=\"tdc-lv5__mo\">\n<div class=\"tdc-lv5__nd\">\n<h2>Scope of activities<\/h2>\n<ul>\n<li>New expressways, expressway widening, access roads<\/li>\n<li>Town bypasses, upgrading and widening of national roads<\/li>\n<li>Coastal roads and inter-port roads<\/li>\n<li>Soft-ground subgrade: organic removal, geotextile, cement columns<\/li>\n<li>Provincial roads, district roads, Class VI rural roads<\/li>\n<li>Urban streets, tourist access roads, eco-tourism trails<\/li>\n<li>Interchange and service-road planning, right-of-way markers<\/li>\n<li>Surveys and supervision of bridge, road and signal maintenance<\/li>\n<\/ul>\n<\/div>\n<div class=\"tdc-lv5__bai\">\n<p>Roads are TDC&#39;s largest body of work: the Eastern North\u2013South, Bien Hoa \u2013 Vung Tau, Trung Luong \u2013 My Thuan and Ho Tram \u2013 Long Thanh expressways; National Roads QL1, QL14, QL18, QL20, QL51, QL55 and QL56; and the provincial road network, urban streets, coastal roads and inter-port roads crossing soft ground in Ba Ria \u2013 Vung Tau.<\/p>\n<h3>New and widened alignments<\/h3>\n<ul>\n<li>Topographic survey with Flycam and GPS RTK; pre-feasibility and feasibility studies; technical design, construction drawings and cost estimates.<\/li>\n<li>Expressway access roads, bypasses, service roads and detailed planning of interchanges on national roads.<\/li>\n<li>Coastal roads including 22 kV lines, substations and lighting.<\/li>\n<li>Right-of-way pegging and boundary markers; BIM models for urban roads and expressway connectors.<\/li>\n<\/ul>\n<h3>Subgrade and pavement<\/h3>\n<ul>\n<li>Inter-port roads across soft ground: testing of organic-soil removal, geotextile, sand fill and cement-stabilised soil columns, including trial construction sections.<\/li>\n<li>Subgrade and pavement testing for national and provincial roads at the LAS-XD HCM.013 laboratory.<\/li>\n<\/ul>\n<h3>Operation and maintenance<\/h3>\n<ul>\n<li>Technical surveys of sections of QL5, QL6, QL38, QL39 and QL48 for the national road network maintenance project (VRAMP).<\/li>\n<li>Supervision of bridge and road maintenance; installation of traffic signals, signs and bus stops; local repairs of subgrade and pavement.<\/li>\n<\/ul>\n<h3>Experience and capability<\/h3>\n<p>The Company has surveyed nearly 400 km of national roads under VRAMP and has designed and supervised many sections of QL1, QL14, QL18, QL20, QL51, QL55 and QL56.<\/p>\n<\/div><\/div>\n<h2 class=\"tdc-lv5__bang-td\" id=\"du-an\">Completed projects<\/h2>\n<table class=\"tdc-lv5__bang\">\n<thead>\n<tr>\n<th class=\"tdc-lv5__stt\">No.<\/th>\n<th>Project name<\/th>\n<th>Project owner<\/th>\n<th class=\"tdc-lv5__gd\">Stage of involvement<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">1<\/td>\n<td>Supervision Consulting for the Project: Management and Maintenance of the Bridge, Road and Waterway System in Ba Ria \u2013 Vung Tau Province, 2017<\/td>\n<td>Ba Ria \u2013 Vung Tau Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">2<\/td>\n<td>Supervision Consulting for the Project: Management and Maintenance of the Bridge, Road and Waterway System in Ba Ria \u2013 Vung Tau Province, 2016<\/td>\n<td>Ba Ria \u2013 Vung Tau Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">3<\/td>\n<td>Supervision Consulting for the Project: Management and Maintenance of the Bridge, Road and Waterway System in Ba Ria \u2013 Vung Tau Province, 2015<\/td>\n<td>Ba Ria \u2013 Vung Tau Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">4<\/td>\n<td>Provincial Road DT.992B (from DT.992C to DT.992) (2026)<\/td>\n<td>Project Steering Board 8 \u2013 HCMC Transport Board<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt bcktkt\">\n<td class=\"tdc-lv5__stt\">5<\/td>\n<td>Renovation and repair of Huynh Tri Manh Street, Phuoc Lap Quarter, My Xuan Ward, Phu My City (2025)<\/td>\n<td>Phu My Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><span class=\"tdc-gd\">Econ.-technical report<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt bcktkt\">\n<td class=\"tdc-lv5__stt\">6<\/td>\n<td>Repair and renovation of the My Xuan \u2013 Toc Tien inter-ward road, My Xuan Ward, Phu My City (2025)<\/td>\n<td>Phu My Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><span class=\"tdc-gd\">Econ.-technical report<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">7<\/td>\n<td>Road connecting National Road 56 and Provincial Road 997, Chau Duc District (component project 01: from PR.997 to PR.765) (2025)<\/td>\n<td>Ngai Giao Commune People&#x27;s Committee<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">8<\/td>\n<td>Kim Long \u2013 Binh Ba road, Chau Duc District (2025)<\/td>\n<td>Ngai Giao Commune People&#x27;s Committee<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt nckt bcktkt\">\n<td class=\"tdc-lv5__stt\">9<\/td>\n<td>Repair and renovation of Ly Thai To Street, Phu My Ward, Phu My City (2025)<\/td>\n<td>Phu My Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><span class=\"tdc-gd\">Feasibility study<\/span><span class=\"tdc-gd\">Econ.-technical report<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt bcktkt\">\n<td class=\"tdc-lv5__stt\">10<\/td>\n<td>Repair and renovation of the road from Group 6 to Group 7, Quarter 5, Hac Dich Ward, Phu My City (2025)<\/td>\n<td>Phu My Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><span class=\"tdc-gd\">Econ.-technical report<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt bcktkt\">\n<td class=\"tdc-lv5__stt\">11<\/td>\n<td>Repair and renovation of the road from Niet Ban Pagoda to Truong Chinh Street, My Xuan Ward, Phu My City (2025)<\/td>\n<td>Phu My Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><span class=\"tdc-gd\">Econ.-technical report<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">12<\/td>\n<td>Access road to Chau Pha stadium (2024)<\/td>\n<td>Phu My Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">13<\/td>\n<td>Nguyen Binh Khiem Street, Vung Tau City (2024)<\/td>\n<td>Tam Thang Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt bvtc\">\n<td class=\"tdc-lv5__stt\">14<\/td>\n<td>Planned road N4, Dat Do Town (2023\u20132024)<\/td>\n<td>Dat Do Commune Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">15<\/td>\n<td>Extension of roads D3 and D5, Hoa Long Commune (2023)<\/td>\n<td>Ba Ria Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bcktkt\">\n<td class=\"tdc-lv5__stt\">16<\/td>\n<td>Sidewalk paving of roads in Tan Hung Commune (Nguyen Huu Canh Street extension) (2023)<\/td>\n<td>Ba Ria Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Econ.-technical report<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">17<\/td>\n<td>Hoang Van Thu Street, Long Tam Ward, Ba Ria (2022)<\/td>\n<td>Ba Ria Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">18<\/td>\n<td>Huynh Khuong Ninh Street, Kim Dinh Ward (2022)<\/td>\n<td>Ba Ria Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">19<\/td>\n<td>Planned road beside the dog farm, Long Tam Ward (2022)<\/td>\n<td>Ba Ria Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">20<\/td>\n<td>Road beside the Long Phuoc tunnels, Long Phuoc Commune (2021)<\/td>\n<td>Ba Ria Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">21<\/td>\n<td>Nguyen Thai Hoc Street, Long Toan Ward (2021)<\/td>\n<td>Ba Ria Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt bvtc\">\n<td class=\"tdc-lv5__stt\">22<\/td>\n<td>Road behind My Xuan \u2013 Thi Vai port (phase 2) (2018\u20132025)<\/td>\n<td>Project Steering Board 8 \u2013 HCMC Transport Board<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt nckt tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">23<\/td>\n<td>Long Son \u2013 Cai Mep road, Vung Tau City (2016\u20132019)<\/td>\n<td>Project Steering Board 8 \u2013 HCMC Transport Board<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><span class=\"tdc-gd\">Feasibility study<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">24<\/td>\n<td>Renovation and upgrading of Le Phung Hieu Street<\/td>\n<td>Tam Thang Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt\">\n<td class=\"tdc-lv5__stt\">25<\/td>\n<td>Renovation, upgrading and widening of Nguyen Van Linh Street (Con Dao)<\/td>\n<td>Con Dao Special Zone Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">26<\/td>\n<td>Road 995C (Nghia Thanh \u2013 Cu Bi)<\/td>\n<td>Project Steering Board 12 \u2013 HCMC Transport Board<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">27<\/td>\n<td>Biet Chinh Street (from 30\/4 Street to 3\/2 Street), Vung Tau City (Luu Chi Hieu Street)<\/td>\n<td>Rach Dua Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">28<\/td>\n<td>Provincial Road DT.992C (from National Road 51 to Ring Road 4)<\/td>\n<td>Project Steering Board 8 \u2013 HCMC Transport Board<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">29<\/td>\n<td>Binh Gia \u2013 Binh Trung \u2013 Quang Thanh connecting road (District Road 29C)<\/td>\n<td>Binh Gia Commune Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt nckt\">\n<td class=\"tdc-lv5__stt\">30<\/td>\n<td>Planned road N11, Phu My new urban area<\/td>\n<td>Phu My Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt nckt\">\n<td class=\"tdc-lv5__stt\">31<\/td>\n<td>Planned road N12, Phu My new urban area<\/td>\n<td>Phu My Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">32<\/td>\n<td>Planned road N10 \u2013 Phu My Ward<\/td>\n<td>Phu My Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt nckt\">\n<td class=\"tdc-lv5__stt\">33<\/td>\n<td>Road No. 82 (Tam Long Ward)<\/td>\n<td>Tam Long Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">34<\/td>\n<td>Access road to the Long Son LNG plant<\/td>\n<td>Long Son Commune Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt nckt\">\n<td class=\"tdc-lv5__stt\">35<\/td>\n<td>Vo Van Kiet Street extension (Tam Long Ward)<\/td>\n<td>Tam Long Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">36<\/td>\n<td>Xa Bang \u2013 Lang Lon road<\/td>\n<td>Chau Duc Commune Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt\">\n<td class=\"tdc-lv5__stt\">37<\/td>\n<td>Widening of the Song Xoai Commune centre road (former My Xuan \u2013 Ngai Giao road)<\/td>\n<td>Tan Thanh Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">38<\/td>\n<td>Upgrading and widening of District Road 14 (Long Dien Commune)<\/td>\n<td>Long Dien Commune Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">39<\/td>\n<td>Upgrading and widening of Luong The Vinh Street (remaining section extended to 2\/9 Street), Vung Tau City<\/td>\n<td>Tam Thang Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt\">\n<td class=\"tdc-lv5__stt\">40<\/td>\n<td>Upgrading and widening of Alley 220, Phan Chu Trinh Street, Vung Tau Ward<\/td>\n<td>Vung Tau Ward Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt\">\n<td class=\"tdc-lv5__stt\">41<\/td>\n<td>Road connecting Vinh Binh \u2013 Vinh An \u2013 Hau Can hamlets (Binh Gia Commune)<\/td>\n<td>Binh Gia Commune Construction Investment PMB<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">42<\/td>\n<td>Survey and design consultancy for the Ho Tram \u2013 Long Thanh International Airport urban expressway project under the public-private partnership (PPP) model<\/td>\n<td>Masterise Long Thanh \u2013 Ho Tram Expressway Infrastructure JSC (MAG)<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tkkt\">\n<td class=\"tdc-lv5__stt\">43<\/td>\n<td>Technical design consultancy for Km85+160-Km97+891 under the construction investment project to widen the Ho Chi Minh City \u2013 Trung Luong \u2013 My Thuan Expressway under the public-private partnership model<\/td>\n<td>A2Z Construction Consultancy JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">44<\/td>\n<td>Survey, construction drawing design and building information modelling (BIM) consultancy, segment Km85+160 \u2013 Km92+370, Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City \u2013 Trung Luong \u2013 My Thuan Expressway under the public-private partnership model<\/td>\n<td>Thanh Huy Group JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">45<\/td>\n<td>Survey, construction drawing design and building information modelling (BIM) consultancy, segment XL04 \u2013 Km92+370 \u2013 Km97+891,44 (including bridges), Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City \u2013 Trung Luong \u2013 My Thuan Expressway under the public-private partnership model<\/td>\n<td>CII Infrastructure Construction JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">46<\/td>\n<td>Survey, construction drawing design and building information modelling (BIM) consultancy, segment XL04 \u2013 Km97+891,44 \u2013 105 +454 (including bridges), Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City \u2013 Trung Luong \u2013 My Thuan Expressway under the public-private partnership model<\/td>\n<td>Thang Long Corporation \u2013 JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">47<\/td>\n<td>Survey consultancy, preparation of the construction investment feasibility study report, environmental impact assessment and building information modelling (BIM), project DATP2-1: construction of the expressway section from the Toc Tien \u2013 Chau Pha intersection to Chau Duc Bridge (including Chau Duc Bridge at the boundary with Dong Nai Province), Ho Chi Minh City Ring Road 4 construction investment project<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Regional Transport and Agricultural Projects Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">48<\/td>\n<td>Survey consultancy, technical design and cost estimate, construction drawing design and BIM management model, project: road connecting to the Bien Hoa \u2013 Vung Tau Expressway (from Vung Van interchange to the PR.994 coastal road)<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">49<\/td>\n<td>Survey consultancy, preparation of the technical design and cost estimate documents and construction drawing design, Component Project 3 of the Bien Hoa \u2013 Vung Tau Expressway construction investment project, phase 1<\/td>\n<td>Cai Mep \u2013 Thi Vai Port Area Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nctkt\">\n<td class=\"tdc-lv5__stt\">50<\/td>\n<td>Survey consultancy and preparation of the pre-feasibility study report, Ba Ria \u2013 Vung Tau Main Road project (expressway connector from Vung Van roundabout on NH55 to Cua Lap roundabout on NH51B)<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Pre-feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">51<\/td>\n<td>Survey consultancy and preparation of the feasibility study report (including BIM), Vung Tau Main Road project (section from the Vung Tau \u2013 Binh Thuan coastal road interchange (PR.994) to the Road 51B, C roundabout interchange, Vung Tau City)<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">52<\/td>\n<td>Survey consultancy and preparation of the feasibility study report (including BIM), project: road connecting to the Bien Hoa \u2013 Vung Tau Expressway (from Vung Van interchange to the PR.994 coastal road)<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">53<\/td>\n<td>Bien Hoa \u2013 Vung Tau Expressway \u2013 Component Project 3, phase 1<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">54<\/td>\n<td>Survey, technical design and cost estimate (excluding the ITS system), design and staking out of the site clearance and right-of-way boundary markers for Km68+340 -:- Km99+000, Phan Thiet \u2013 Dau Giay construction investment component project, under the project for construction investment in several sections of the Eastern North \u2013 South Expressway, 2017-2020 phase<\/td>\n<td>Thang Long Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">55<\/td>\n<td>Survey, technical design and cost estimate, staking out of the site clearance and right-of-way boundary markers for Km134-Km168, Vinh Hao \u2013 Phan Thiet construction investment component project, under the Vinh Hao \u2013 Phan Thiet section investment project of the project for investment in several sections of the Eastern North \u2013 South Expressway, 2017-2020 phase<\/td>\n<td>Project Management Unit 7<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">56<\/td>\n<td>Construction investment project for the Trung Luong \u2013 My Thuan Expressway, phase 1, under a BOT contract, Contract Package XL13 for Km76+934.28 -:- Km78+956.007; XL14 for the stretch Km78+956.007 -:- Km81+871.870<\/td>\n<td>Trung Luong \u2013 My Thuan BOT Company<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks\">\n<td class=\"tdc-lv5__stt\">57<\/td>\n<td>Technical survey, Component Project 3, NH5 section: Ha Noi \u2013 Hai Duong (Km43+900 \u2013 Km93+00) \u2013 VRAM<\/td>\n<td>Project Management Unit 3 \u2013 Directorate for Roads of Vietnam<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks\">\n<td class=\"tdc-lv5__stt\">58<\/td>\n<td>Technical survey, Component Project 3, NH6 section: Hoa Binh \u2013 Son La (Km78+300 \u2013 Km303+000) \u2013 VRAM<\/td>\n<td>Project Management Unit 3 \u2013 Directorate for Roads of Vietnam<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks\">\n<td class=\"tdc-lv5__stt\">59<\/td>\n<td>Technical survey, Component Project 3, NH38 section: Quan Goi \u2013 Yen Lenh (Km33+130 \u2013 Km52+827) \u2013 VRAM<\/td>\n<td>Project Management Unit 3 \u2013 Directorate for Roads of Vietnam<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks\">\n<td class=\"tdc-lv5__stt\">60<\/td>\n<td>Technical survey, Component Project 3, NH39-1 section: Trieu Duong \u2013 Hung Ha (Km42+714 \u2013 Km64+000) \u2013 VRAM<\/td>\n<td>Project Management Unit 3 \u2013 Directorate for Roads of Vietnam<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks\">\n<td class=\"tdc-lv5__stt\">61<\/td>\n<td>Technical survey, Component Project 3, NH48 section \u2013 Nghe An Province (Km 00 \u2013 Km 20 + Km 38 \u2013 Km 64) \u2013 VRAM<\/td>\n<td>Project Management Unit 3 \u2013 Directorate for Roads of Vietnam<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt\">\n<td class=\"tdc-lv5__stt\">62<\/td>\n<td>Preparation of construction investment projects for the Year 4 component projects \u2013 Road network maintenance component \u2013 WB4 Project<\/td>\n<td>Project Management Unit 2 \u2013 Vietnam Road Administration<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">63<\/td>\n<td>Survey and design consultancy, NH56 project \u2013 Ba Ria Town bypass<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">64<\/td>\n<td>Survey and design consultancy, Ba Ria Town bypass project \u2013 NH56, Ba Ria \u2013 Vung Tau Province.<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks\">\n<td class=\"tdc-lv5__stt\">65<\/td>\n<td>Survey and investigation for Year 3.2 of the programme (topographic, hydrological, geotechnical, pavement and traffic volume surveys, plus support and study of related engineering issues)<\/td>\n<td>Egis Bceom International<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">66<\/td>\n<td>Survey consultancy and preparation of the design documents, NH55 bypass through An Nhut Commune, Long Dien District and Dat Do Township, Dat Do District<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">67<\/td>\n<td>Survey consultancy, preparation of the construction drawing design and cost estimate: road from NH12C to the Formosa integrated steel complex, Ha Tinh Province<\/td>\n<td>Ha Tinh Provincial Economic Zone Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">68<\/td>\n<td>Survey and design consultancy for the widening of NH51 through Ba Ria \u2013 Vung Tau Province<\/td>\n<td>Bien Hoa \u2013 Vung Tau Expressway Development JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">69<\/td>\n<td>Survey and design, project for the upgrading and widening of NH55 through Ba Ria \u2013 Vung Tau Province<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">70<\/td>\n<td>Survey and design, final section of NH51 (NH51B route)<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">71<\/td>\n<td>Survey and design, project for the upgrading and widening of NH56 through Ba Ria \u2013 Vung Tau Province<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">72<\/td>\n<td>NH14 western bypass road, Buon Ma Thuot City<\/td>\n<td>Buon Ma Thuot City Projects Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">73<\/td>\n<td>Eastern North \u2013 South Expressway, 2017-2020 phase, Vinh Hao \u2013 Phan Thiet section<\/td>\n<td>Project Management Unit 7<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">74<\/td>\n<td>Eastern North \u2013 South Expressway, 2017-2020 phase, Phan Thiet \u2013 Dau Giay section<\/td>\n<td>Thang Long Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">75<\/td>\n<td>Survey and design of the Trung Luong \u2013 My Thuan Expressway (BOT project)<\/td>\n<td>TEDI \u2013 Transport Engineering Design Incorporated, JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">76<\/td>\n<td>Survey and technical design with cost estimate, NH56 \u2013 Ba Ria Town bypass<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">77<\/td>\n<td>NH55 bypass through An Ngai Commune (project)<\/td>\n<td>Transport Project Management Unit II<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">78<\/td>\n<td>Final section of NH51<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks qh tk\">\n<td class=\"tdc-lv5__stt\">79<\/td>\n<td>Survey and detailed planning design of the interchanges and service roads on NH56<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Planning<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">80<\/td>\n<td>Survey and preparation of the construction investment project for the Ba Ria Town bypass \u2013 NH56, Ba Ria \u2013 Vung Tau Province.<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">81<\/td>\n<td>Topographic and geotechnical survey and preparation of the construction drawing design and cost estimate, Contract Package TV-08, widening of NH51 (km47-Km56)<\/td>\n<td>Bien Hoa \u2013 Vung Tau Expressway Development JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">82<\/td>\n<td>NH14 western bypass road, Buon Ma Thuot City, Contract Package No. 03 (2007 scheme)<\/td>\n<td>Buon Ma Thuot City Projects Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">83<\/td>\n<td>NH14 western bypass road, Buon Ma Thuot City, Contract Package No. 04 (2007 scheme)<\/td>\n<td>Buon Ma Thuot City Projects Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">84<\/td>\n<td>Survey and construction drawing design, upgrading and widening of NH55 (Contract Package No. 1 \u2013 Km45+850 -:- Km52+305)<\/td>\n<td>Ba Ria \u2013 Vung Tau Transport Works JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">85<\/td>\n<td>Rehabilitation and upgrading of NH56 through Ba Ria \u2013 Vung Tau Province (Contract Package 1: Km18+020 -:- Km23+600)<\/td>\n<td>Transport Works Company 875<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">86<\/td>\n<td>Construction drawing design, final section of NH51 (former NH51B route), Contract Package No. 01<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">87<\/td>\n<td>Survey and technical design, NH55, Lang Dai \u2013 Binh Thuan section<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">88<\/td>\n<td>Construction drawing design for the upgrading of NH51B (Contract Package No. 3)<\/td>\n<td>Dong Tam Co., Ltd<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">89<\/td>\n<td>Survey and technical design, NH56 (later section: Km18+020 -:- Km50+457)<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">90<\/td>\n<td>Survey and project preparation, NH55, Lang Dai \u2013 Binh Thuan section<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">91<\/td>\n<td>Survey, technical design and cost estimate, and construction drawing design, Road 991B from NH51 to the downstream area of Cai Mep Port, ROAD SECTION (excluding the overpass at the NH51 interchange)<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">92<\/td>\n<td>Survey and construction drawing design, Phuoc Hoa \u2013 Cai Mep road, road section<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">93<\/td>\n<td>Survey consultancy, technical design, construction drawing design and cost estimate for the stretch from Km16+200 to Km16+380 of inter-port road section 7 (Km15+561,31-Km17+271,13)<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">94<\/td>\n<td>Survey and construction drawing design, Cai Mep \u2013 Thi Vai inter-port road, Section 8<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">95<\/td>\n<td>Survey and technical design, Cai Mep \u2013 Thi Vai inter-port road, Section 8<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">96<\/td>\n<td>Construction drawing design \u2013 coastal road from Cua Lap Bridge to Lo Voi junction, Long Dien District<\/td>\n<td>Long Dien District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks\">\n<td class=\"tdc-lv5__stt\">97<\/td>\n<td>Survey and project preparation, Road N4 around the shore of Xuyen Moc Lake<\/td>\n<td>Xuyen Moc District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">98<\/td>\n<td>Survey for the technical design stage, technical design and cost estimate, and construction drawing design, road and bridge from Go Gang to Long Son, section connecting to the Lang Cat \u2013 Long Son road<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">99<\/td>\n<td>Survey and preparation of the construction investment project for the rehabilitation and upgrading of the coastal road from Cua Lap Bridge to Lo Voi junction, Long Dien District<\/td>\n<td>Long Dien District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">100<\/td>\n<td>Survey, technical design and cost estimate, Section 4 of the Cai Mep \u2013 Thi Vai inter-port road<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">101<\/td>\n<td>Survey, technical design and construction drawing design, revised road from Go Gang Island to Long Son Island (following the change of scale)<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">102<\/td>\n<td>Survey and construction drawing design for the additional 22 kV power line, transformer station and lighting system, Dung Quat \u2013 Sa Huynh coastal road, My Khe \u2013 Tra Khuc section<\/td>\n<td>Quang Ngai Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">103<\/td>\n<td>Survey and project preparation, road and bridge from Go Gang to Long Son, section connecting to the Lang Cat \u2013 Long Son road<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">104<\/td>\n<td>Survey, technical design and cost estimate, alignment of Section 7 of the Cai Mep \u2013 Thi Vai inter-port road (Km15+561,31 -:- Km17+271,13)<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">105<\/td>\n<td>Survey, technical design and cost estimate, road works of Section 6 of the Cai Mep \u2013 Thi Vai inter-port road<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">106<\/td>\n<td>Survey, technical design and cost estimate, road works of Section 1 of the Cai Mep \u2013 Thi Vai inter-port road<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">107<\/td>\n<td>Survey and construction drawing design, Section 3 (Km7+199,25 -:- Km9+612,64) of the Cai Mep \u2013 Thi Vai inter-port road project<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">108<\/td>\n<td>Survey and project preparation, Road 991B from NH51 to the downstream area of Cai Mep Port, Tan Thanh District.<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">109<\/td>\n<td>Survey and project preparation, Phuoc Hoa \u2013 Cai Mep road, Tan Thanh District<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">110<\/td>\n<td>Survey and technical design, Section 3 (Km7+199,25 -:- Km9+612,64) of the Cai Mep \u2013 Thi Vai inter-port road<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">111<\/td>\n<td>Topographic and geotechnical survey and project preparation for the alignment of the Cai Mep \u2013 Thi Vai inter-port road<\/td>\n<td>Major Bridge and Tunnel Design Consultancy JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">112<\/td>\n<td>Survey and construction drawing design, Dung Quat \u2013 Sa Huynh coastal road, My Khe \u2013 Tra Khuc section<\/td>\n<td>Quang Ngai Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">113<\/td>\n<td>Survey, technical design and construction drawing design, road from Go Gang Island to Long Son Island, Long Son Commune, Vung Tau City<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">114<\/td>\n<td>Survey, technical and construction design, Vung Tau \u2013 Binh Thuan (VT \u2013 BT) coastal road, Ben Loi \u2013 Binh Chau section (70 km)<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">115<\/td>\n<td>Survey consultancy, preparation of the technical design and cost estimate documents, construction drawing design and building information modelling (BIM), project for the upgrading and widening of the Hoi Bai \u2013 Phuoc Tan road (PR.992) from NH51 to the Bien Hoa \u2013 Vung Tau Expressway<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">116<\/td>\n<td>Survey consultancy and construction design (including building information modelling, BIM), Provincial Road 991 extension project (from NH51 to the Cai Mep \u2013 Thi Vai inter-port road)<\/td>\n<td>Cai Mep \u2013 Thi Vai Port Area Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkcs\">\n<td class=\"tdc-lv5__stt\">117<\/td>\n<td>Survey consultancy and construction design following the basic design, project for the upgrading and widening of the Ba Ria \u2013 Chau Pha \u2013 Hac Dich road (PR.995B)<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Basic design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">118<\/td>\n<td>Survey consultancy and construction design, project for the upgrading and widening of Provincial Road 328 (remaining section), Xuyen Moc District<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">119<\/td>\n<td>Survey consultancy and construction design, project for the upgrading of Provincial Road 44B within Long Dien District and Dat Do District<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">120<\/td>\n<td>Survey consultancy and construction design, project for the rehabilitation and upgrading of the Minh Dam mountainside road from PR.44A beside the Thuy Duong tourist resort to Long Phu junction, Phuoc Hai Township, Dat Do District<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">121<\/td>\n<td>Survey and design consultancy, Provincial Road 44B (section from Bau Ong Dan junction to Provincial Road 52)<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">122<\/td>\n<td>Survey and design consultancy, project for the rehabilitation and upgrading of the Minh Dam mountainside road from PR.44A beside the Thuy Duong tourist resort to Long Phu junction, Phuoc Hai Township, Dat Do District.<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">123<\/td>\n<td>Survey and design consultancy, Thong Nhat Road (extension), Wards 1 and 3 and Thang Tam Ward, Vung Tau City<\/td>\n<td>Vung Tau City Construction Investment Project Management Unit No. 1<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">124<\/td>\n<td>Survey and design consultancy, Planned Road AIII, Ward 12, Vung Tau City<\/td>\n<td>Vung Tau City Construction Investment Project Management Unit No. 1<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">125<\/td>\n<td>Survey and design consultancy, Planned Road P (sections 1 and 2, from Road 13 to Planned Road 33), Phu My Township<\/td>\n<td>Tan Thanh District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">126<\/td>\n<td>Survey and design consultancy for the upgrading and widening of Provincial Road 328, Xuyen Moc District<\/td>\n<td>Transport Project Management Unit II<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">127<\/td>\n<td>Survey and design consultancy, 30\/4 Road project from Chi Linh junction to Eo Ong Tu, Vung Tau City<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">128<\/td>\n<td>Survey and design consultancy, Binh Ba \u2013 Da Bac \u2013 Phuoc Tan road project (Hoi Bai \u2013 Chau Pha \u2013 Da Bac \u2013 Phuoc Tan road, phase 2)<\/td>\n<td>Transport Project Management Unit II<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">129<\/td>\n<td>Survey and design consultancy, Phuoc Hai \u2013 Dat Do road project<\/td>\n<td>Dat Do Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">130<\/td>\n<td>Survey and design consultancy, Hang Dieu Road project (section from 30\/4 Road to Road 51C), Vung Tau City<\/td>\n<td>Vung Tau City Construction Investment Project Management Unit No. 1<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">131<\/td>\n<td>Survey and design consultancy, investment project for the upgrading of the Lang Cat \u2013 Long Son road (Hoang Sa Road)<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">132<\/td>\n<td>Survey consultancy, design and BIM management model, project: Nguyen Phong Sac Road, Vung Tau City.<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Specialised Transport and Civil Works Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">133<\/td>\n<td>Survey and design consultancy, Planned Road D13, Residential Area No. 9 (western branch of Road S), Phu My Town, Ba Ria \u2013 Vung Tau Province<\/td>\n<td>Phu My Town Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">134<\/td>\n<td>Survey and design consultancy, Binh Gia Road project (section from 30\/4 Road to the connection with 2\/9 Road), Vung Tau City<\/td>\n<td>Vung Tau City Construction Investment Project Management Unit No. 2<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">135<\/td>\n<td>Survey and design consultancy, project for the rehabilitation and upgrading of Road 965, Phu My Town<\/td>\n<td>Cai Mep \u2013 Thi Vai Port Area Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">136<\/td>\n<td>Survey and construction drawing design, rehabilitation and upgrading of the Minh Dam mountainside road from PR.44 beside the Thuy Duong tourist resort to Long Phu junction, Phuoc Hai Township, Dat Do District (phase 1)<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">137<\/td>\n<td>Survey and construction drawing design, Provincial Road 52 through the centre of Long Tan Commune, Dat Do District (Km31+900 -:- Km32+947 and Km37+340 -:- Km37+880)<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ctdt\">\n<td class=\"tdc-lv5__stt\">138<\/td>\n<td>Planned Road P (sections 1 and 2, from Road 13 to Planned Road 33), Phu My Township<\/td>\n<td>Tan Thanh District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Investment policy<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">139<\/td>\n<td>Provincial Road 328 (project)<\/td>\n<td>Transport Project Management Unit II<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">140<\/td>\n<td>Survey and re-preparation of the construction investment project for Nguyen Tat Thanh Road (extension of Planned Road No. 02), Ba Ria Town<\/td>\n<td>Ba Ria Town Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">141<\/td>\n<td>Survey and re-preparation of the construction investment project for Rural Road 10, Ba Ria Town<\/td>\n<td>Ba Ria Town Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">142<\/td>\n<td>Survey and technical design; survey and construction drawing design, 30\/4 Road from Chi Linh junction to Eo Ong Tu, Vung Tau City<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">143<\/td>\n<td>Construction drawing design, Planned Road No. 7, Long Hai Township, Long Dien District<\/td>\n<td>Long Dien District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">144<\/td>\n<td>Survey and preparation of the construction investment project for Planned Road No. 7, Long Hai Township, Long Dien District (Section 1)<\/td>\n<td>Long Dien District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tk\">\n<td class=\"tdc-lv5__stt\">145<\/td>\n<td>Revised design of the patrol trail combined with eco-tourism, Con Dao National Park<\/td>\n<td>Con Dao National Park Management Board<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">146<\/td>\n<td>Survey and construction drawing design, Hai Lam \u2013 Bau Tru road, Long Dien District<\/td>\n<td>Long Dien District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">147<\/td>\n<td>Survey and construction drawing design, Binh Ba \u2013 Da Bac \u2013 Phuoc Tan road (Hoi Bai \u2013 Chau Pha \u2013 Da Bac \u2013 Phuoc Tan road, phase 2)<\/td>\n<td>Transport Project Management Unit II<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">148<\/td>\n<td>Survey and construction drawing design, Planned Road No. 02, Phuoc Buu, Xuyen Moc District<\/td>\n<td>Xuyen Moc District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">149<\/td>\n<td>Survey and construction drawing design, Phuoc Hai \u2013 Dat Do road<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">150<\/td>\n<td>Survey and construction drawing design, Planned Road No. 9, Long Hai, Long Dien District<\/td>\n<td>Long Dien District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">151<\/td>\n<td>Topographic, geotechnical and pavement-subgrade survey and preparation of the investment project for 30\/4 Road from Chi Linh junction to Eo Ong Tu, Vung Tau City<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">152<\/td>\n<td>Topographic and geotechnical survey and construction drawing design, Planned Road No. 4, section 2, Phuoc Buu Township, Xuyen Moc District<\/td>\n<td>Xuyen Moc District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">153<\/td>\n<td>Survey and construction drawing design, revised Contract Package No. 03 (subgrade, pavement and stormwater drainage over Km10 -Km11, Km11+400 -:- Km13+100 and Km13+650 -:- Km13+954,04), Western Ring Road, Buon Ma Thuot City (2010)<\/td>\n<td>Buon Ma Thuot City Projects Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">154<\/td>\n<td>Survey and preparation of the investment project for the Phuoc Hai \u2013 Dat Do road<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">155<\/td>\n<td>Survey and construction drawing design, revised Contract Package No. 03, Western Ring Road, Buon Ma Thuot City (2009)<\/td>\n<td>Buon Ma Thuot City Projects Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">156<\/td>\n<td>Survey and construction drawing design, revised Contract Package No. 04, Western Ring Road, Buon Ma Thuot City (2009)<\/td>\n<td>Buon Ma Thuot City Projects Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">157<\/td>\n<td>Survey and construction drawing design, Planned Road No. 2 (phase 1), Phuoc Hai Township, Dat Do District<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">158<\/td>\n<td>Construction drawing design for the upgrading of Ngo Quyen Road, Ward 10, Vung Tau City<\/td>\n<td>Vung Tau City Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">159<\/td>\n<td>Construction drawing design, Road D10, Ward 10, Vung Tau City<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Land Fund Development Centre<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">160<\/td>\n<td>Survey and construction drawing design, Phuoc Hai \u2013 Loc An road, Phuoc Hai Commune, Dat Do<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">161<\/td>\n<td>Construction drawing design, Planned Road No. 2, Phuoc Long Tho Commune, Dat Do District<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">162<\/td>\n<td>Construction drawing design, Planned Road No. 3, Phuoc Long Tho Commune<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">163<\/td>\n<td>Survey and preparation of the investment project for Planned Road N1, Chi Linh \u2013 Cua Lap tourist area, Vung Tau City<\/td>\n<td>Vung Tau City Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">164<\/td>\n<td>Survey and preparation of the investment project for Planned Road B2, Chi Linh \u2013 Cua Lap tourist area, Vung Tau City<\/td>\n<td>Vung Tau City Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt\">\n<td class=\"tdc-lv5__stt\">165<\/td>\n<td>Investment project for the road up Nui Lon, Vung Tau City<\/td>\n<td>Transport Project Management Unit II<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc\">\n<td class=\"tdc-lv5__stt\">166<\/td>\n<td>Survey and construction drawing design, Provincial Road 52 through the Dat Do District town centre<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tkkt\">\n<td class=\"tdc-lv5__stt\">167<\/td>\n<td>Revised technical design, Chi Linh Road (Nguyen Huu Canh)<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tkkt\">\n<td class=\"tdc-lv5__stt\">168<\/td>\n<td>Technical design, North \u2013 South Axis Road No. 3 (Loc An \u2013 Suoi Rao road), Ba Ria \u2013 Vung Tau Province<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bvtc\">\n<td class=\"tdc-lv5__stt\">169<\/td>\n<td>Construction drawing design, Planned Road No. 14, Kim Dinh Ward, Ba Ria Town<\/td>\n<td>Ba Ria Town Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt\">\n<td class=\"tdc-lv5__stt\">170<\/td>\n<td>Investment project for the rehabilitation and upgrading of the Minh Dam mountainside road from PR.44 beside the Thuy Duong tourist resort to Long Phu junction, Loc An Commune (basic design appraisal already obtained)<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt\">\n<td class=\"tdc-lv5__stt\">171<\/td>\n<td>Survey and preparation of the investment project for Provincial Road 52 through the Dat Do District town centre<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><\/td>\n<\/tr>\n<tr data-gd=\"bcktkt\">\n<td class=\"tdc-lv5__stt\">172<\/td>\n<td>Economic-technical report, road from Mr Hoai&#x27;s land to Lo O, Phuoc Long Tho, continuing to Bau Beo (the former Bau Beo road)<\/td>\n<td>Dat Do District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Econ.-technical report<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tkkt\">\n<td class=\"tdc-lv5__stt\">173<\/td>\n<td>Technical design for the upgrading of the eco-tourism trail system, Con Dao National Park<\/td>\n<td>Con Dao National Park Management Board<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">174<\/td>\n<td>Survey, project preparation and technical and construction design for the rehabilitation and upgrading of Rural Road 3, Ba Ria Town<\/td>\n<td>Ba Ria Town Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks nckt tkkt bvtc\">\n<td class=\"tdc-lv5__stt\">175<\/td>\n<td>Survey, project preparation and technical and construction design for the rehabilitation and upgrading of Rural Road 8, Ba Ria Town<\/td>\n<td>Ba Ria Town Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Feasibility study<\/span><span class=\"tdc-gd\">Technical design<\/span><span class=\"tdc-gd\">Construction drawings<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tkkt\">\n<td class=\"tdc-lv5__stt\">176<\/td>\n<td>Technical design, Chau Pha \u2013 Phuoc Tan road (branch 2)<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">177<\/td>\n<td>North \u2013 South main road (phase 3), Long Dat District (replaced by a red-gravel rural road from NH55 to Chan Tien Mountain, An Ngai Commune)<\/td>\n<td>Long Dien District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tk\">\n<td class=\"tdc-lv5__stt\">178<\/td>\n<td>Design of Planned Road No. 2, Phuoc Buu Township, Xuyen Moc District<\/td>\n<td>Xuyen Moc District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">179<\/td>\n<td>Provincial Road 44B \u2013 phase 2, Long Dat District<\/td>\n<td>Long Dien District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">180<\/td>\n<td>Project for the tourist jetties at Hon Cau and Hon Bay Canh and the eco-tourism trails of Con Dao National Park (trail system, plus the tourist jetties at Hon Cau and Hon Bay Canh)<\/td>\n<td>Con Dao National Park Management Board<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"nckt tkkt\">\n<td class=\"tdc-lv5__stt\">181<\/td>\n<td>Project preparation and technical design, Planned Road No. 5 (Road 328 extension to Xom Ray)<\/td>\n<td>Xuyen Moc District Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Feasibility study<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tkkt\">\n<td class=\"tdc-lv5__stt\">182<\/td>\n<td>Survey and technical design, access road to the Nui Dinh tourist area (Package 1)<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tkkt\">\n<td class=\"tdc-lv5__stt\">183<\/td>\n<td>Technical design, ring road adjoining the provincial Administrative and Political Centre<\/td>\n<td>Project Management Unit of the Ba Ria \u2013 Vung Tau Provincial Department of Construction<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tkkt\">\n<td class=\"tdc-lv5__stt\">184<\/td>\n<td>Technical design, Planned Road No. 11 (section linking NH56 and Rural Road 10), Ba Ria Town<\/td>\n<td>Ba Ria Town Construction Investment Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Technical design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">185<\/td>\n<td>Project for the ring road adjoining the Administrative and Political Centre<\/td>\n<td>Project Management Unit of the Ba Ria \u2013 Vung Tau Provincial Department of Construction<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks tk\">\n<td class=\"tdc-lv5__stt\">186<\/td>\n<td>Survey and design, Rural Transport Project 2, Ba Ria \u2013 Vung Tau Province (48.8 km) \u2013 Class VI road)<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Design<\/span><\/td>\n<\/tr>\n<tr data-gd=\"\">\n<td class=\"tdc-lv5__stt\">187<\/td>\n<td>Upgrading of Le Loi Road, Vung Tau City<\/td>\n<td>Transport Project Management Unit I<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd tdc-gd--trong\">\u2014<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">188<\/td>\n<td>Supervision consultancy for the management and maintenance of the bridge, road and inland waterway network in the province<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">189<\/td>\n<td>Supervision consultancy for the management and maintenance of the bridge, road and waterway network in Ba Ria \u2013 Vung Tau Province, 2012-2018 period<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">190<\/td>\n<td>Supervision of the annual management and maintenance of the traffic signal system in Ba Ria \u2013 Vung Tau Province, 2012-2018 period<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">191<\/td>\n<td>Supervision of localised repairs to the subgrade and pavement over Km5+500 -:- Km6+750; Km8+900 -:- Km9+000; Km38+000 -:- Km41+000 on NH55, Ba Ria \u2013 Vung Tau Province<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">192<\/td>\n<td>Supervision of the 2013 installation of traffic signals, flashing amber lights in the districts and road signs across the province<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">193<\/td>\n<td>Supervision of the installation of bus stops and shelters<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"ks bvtc gstc\">\n<td class=\"tdc-lv5__stt\">194<\/td>\n<td>Provision of survey services; construction drawing design; preparation of the total cost estimate; preparation of bidding documents and evaluation for the selection of the construction contractor; and construction supervision for all works on the road connecting to the SP-SSA international container terminal internal road<\/td>\n<td>Saigon Port \u2013 SSA International Container Services Joint Venture<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Survey<\/span><span class=\"tdc-gd\">Construction drawings<\/span><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">195<\/td>\n<td>Supervision of filling works in the Interflour area, phase II, and part C of the additional 20.6 ha lease area, Cai Mep Industrial Park<\/td>\n<td>Saigon Construction Corporation<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">196<\/td>\n<td>Upgrading and widening of NH56 through Ba Ria \u2013 Vung Tau Province<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">197<\/td>\n<td>Supervision of repairs to Vo Thi Sau Road, Long Dien District<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">198<\/td>\n<td>Supervision of the 2014 management and maintenance of the traffic signal system<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">199<\/td>\n<td>Supervision of the 2014 management and maintenance of the road and bridge network in Ba Ria \u2013 Vung Tau Province<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">200<\/td>\n<td>Supervision of the 2013 management and maintenance of the road and bridge network in Ba Ria \u2013 Vung Tau Province<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"gstc\">\n<td class=\"tdc-lv5__stt\">201<\/td>\n<td>Supervision of the 2012 management and maintenance of the road transport network<\/td>\n<td>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Construction supervision<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">202<\/td>\n<td>Contract package (No. 10) for testing during the trial construction stage, project for the rehabilitation and upgrading of Road 965, Phu My Town<\/td>\n<td>Cai Mep \u2013 Thi Vai Port Area Transport Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">203<\/td>\n<td>Testing during trial construction, Cai Mep \u2013 Thi Vai inter-port road, Section 8<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">204<\/td>\n<td>Testing on the Cai Mep \u2013 Thi Vai inter-port road, Section 8, construction contract package 24 (Km17+271,13-Km17+690,85), items: ground treatment and subgrade<\/td>\n<td>Ha Noi Construction JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">205<\/td>\n<td>Testing on the Cai Mep \u2013 Thi Vai inter-port road, Section 7, trial construction<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">206<\/td>\n<td>Quality testing for the contract package covering pavement construction and technical infrastructure along the route, Cai Mep \u2013 Thi Vai inter-port road project, Section 4 (Km9+612,64 -:- Km11+698,78)<\/td>\n<td>Road and Bridge Construction Division 1 \u2013 Civil Engineering Construction Corporation No. 8<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">207<\/td>\n<td>Construction quality testing for the subgrade, removal of organic soil, geotextile laying and sand filling items, Cai Mep \u2013 Thi Vai inter-port road, Section 7 (Km15+651,31 -:- Km17+272,13)<\/td>\n<td>Chien Thang Construction Co., Ltd<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">208<\/td>\n<td>Works quality testing, Cai Mep \u2013 Thi Vai inter-port road, Section 1 \u2013 construction contract package 02, item: subgrade from Km0+800 -:- Km1+300, ground treatment using cement deep soil mixing columns (full-scale construction stage)<\/td>\n<td>Chau Thanh Transport and Urban Construction JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">209<\/td>\n<td>Construction quality testing for the cement deep soil mixing column item, full-scale construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 1, construction contract package 03 (Km1+300 -:- Km1+898,03)<\/td>\n<td>Dong Nam Construction Co., Ltd<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">210<\/td>\n<td>Construction quality testing, Contract Package No. 09: construction of the stretch from Km0+00 -:- Km1+437,53, NH56 project \u2013 Ba Ria Town bypass<\/td>\n<td>Ho Chi Minh City branch of IDICO Petroleum Construction Investment JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">211<\/td>\n<td>Construction quality testing for the subgrade item (excluding testing of cement soil columns), full-scale construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 3, construction contract package 02 (Km8+800 -:- Km1+300)<\/td>\n<td>Ba Ria \u2013 Vung Tau Transport Works JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">212<\/td>\n<td>Construction quality testing for the subgrade item (excluding testing of cement soil columns), full-scale construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 1, construction contract package 02 (Km0+800 -:- Km1+300)<\/td>\n<td>Ba Ria \u2013 Vung Tau Transport Works JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">213<\/td>\n<td>Testing during the trial construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 1 (Km0+000 -:- Km1+898,03)<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">214<\/td>\n<td>Testing during the trial construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 6<\/td>\n<td>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">215<\/td>\n<td>Construction quality testing for the subgrade item (excluding testing of cement soil columns), full-scale construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 1, construction contract package 03 (Km1+300 -:- Km1+898,03)<\/td>\n<td>Dong Nam Construction Co., Ltd<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">216<\/td>\n<td>Construction quality testing for the subgrade item and for ground treatment using cement deep soil mixing columns, full-scale construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 6 (Km14+424,98 -:- Km15+561,31), construction contract package 02<\/td>\n<td>886 \u2013 Thanh Nam Construction Investment JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">217<\/td>\n<td>Quality testing on the Cai Mep \u2013 Thi Vai inter-port road, Section 3 \u2013 package 1 (Km7+199,25 -:- Km8+800), cement deep soil mixing column item, full-scale construction stage<\/td>\n<td>Airport Construction Single-Member Co., Ltd \u2013 ACC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">218<\/td>\n<td>Construction quality inspection testing, Contract Package No. 01 (Km7+199,25 -:- Km8+800), Cai Mep \u2013 Thi Vai inter-port road, Section 3 (subgrade works).<\/td>\n<td>Road and Bridge Division \u2013 Ba Ria \u2013 Vung Tau Urban Construction and Development JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">219<\/td>\n<td>Quality testing on the Cai Mep \u2013 Thi Vai inter-port road, Section 3 \u2013 package 1, cement deep soil mixing column item, trial construction stage<\/td>\n<td>Airport Construction Single-Member Co., Ltd \u2013 ACC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">220<\/td>\n<td>Quality testing for the subgrade item, Cai Mep \u2013 Thi Vai inter-port road, Section 3, construction contract package 02<\/td>\n<td>Ba Ria \u2013 Vung Tau Transport Works JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">221<\/td>\n<td>Quality inspection testing of transport works, Contract Package No. 05b (Km83+400 -:- Km84+767,5), rehabilitation and upgrading of the final section of NH51<\/td>\n<td>Ba Ria \u2013 Vung Tau Transport Works JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">222<\/td>\n<td>Construction quality inspection testing, Contract Package No. 05a (Km82+030 -:- Km83+400), rehabilitation and upgrading of NH51<\/td>\n<td>Road and Bridge Division \u2013 Ba Ria \u2013 Vung Tau Urban Construction and Development JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">223<\/td>\n<td>Construction quality inspection testing, Contract Package No. 12 (Km0+00 -:- Km4+500), upgrading of the Hoi Bai \u2013 Chau Pha \u2013 Da Bac \u2013 Phuoc Tan road (phase 1)<\/td>\n<td>Road and Bridge Division \u2013 Ba Ria \u2013 Vung Tau Urban Construction and Development JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<tr data-gd=\"tnkd\">\n<td class=\"tdc-lv5__stt\">224<\/td>\n<td>Construction quality inspection testing for the stretch Km10+471,49 -:- Km13+550,95 within Contract Package No. 14 (Km9+00 -:- Km13+550,95), upgrading of the Hoi Bai \u2013 Chau Pha \u2013 Da Bac \u2013 Phuoc Tan road (phase 1)<\/td>\n<td>Tan Thanh Construction Investment and Manufacturing JSC<\/td>\n<td class=\"tdc-lv5__gd\"><span class=\"tdc-gd\">Testing &amp; inspection<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Expressways, national and provincial roads, coastal roads and inter-port roads across soft ground \u2013 from Flycam and GPS RTK survey to design, construction supervision and subgrade and pavement testing in the LAS-XD laboratory.<\/p>\n","protected":false},"author":0,"featured_media":382,"parent":457,"menu_order":12,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-987","page","type-page","status-publish","has-post-thumbnail","hentry","description-off"],"_links":{"self":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/987","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/types\/page"}],"replies":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/comments?post=987"}],"version-history":[{"count":0,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/987\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/457"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/media\/382"}],"wp:attachment":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/media?parent=987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}