{"id":460,"date":"2026-09-07T21:39:03","date_gmt":"2026-09-07T14:39:03","guid":{"rendered":"https:\/\/tuvangiaothong.com\/materials-testing-quality-inspection\/"},"modified":"2026-10-09T20:26:38","modified_gmt":"2026-10-09T13:26:38","slug":"materials-testing-quality-inspection","status":"publish","type":"page","link":"https:\/\/tuvangiaothong.com\/en\/fields-of-activity\/materials-testing-quality-inspection\/","title":{"rendered":"Materials Testing &#038; Quality Inspection (LAS-XD HCM.013)"},"content":{"rendered":"<div>\n<blockquote>\n<div>\n<table>\n<tbody>\n<tr>\n<td>\n<h3>No<\/h3>\n<\/td>\n<td>\n<h3>Project Name<\/h3>\n<\/td>\n<td>\n<h3>Project Owner<\/h3>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>1<\/p>\n<\/td>\n<td>\n<p>Contract package (No. 10) for testing during the trial construction stage, project for the rehabilitation and upgrading of Road 965, Phu My Town<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Port Area Transport Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>2<\/p>\n<\/td>\n<td>\n<p>Testing during trial construction, Cai Mep \u2013 Thi Vai inter-port road, Section 8<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>3<\/p>\n<\/td>\n<td>\n<p>Testing on the Cai Mep \u2013 Thi Vai inter-port road, Section 8, construction contract package 24 (Km17+271,13-Km17+690,85), items: ground treatment and subgrade<\/p>\n<\/td>\n<td>\n<p>Ha Noi Construction JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>4<\/p>\n<\/td>\n<td>\n<p>Testing on the Cai Mep \u2013 Thi Vai inter-port road, Section 7, trial construction<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>5<\/p>\n<\/td>\n<td>\n<p>Quality testing for the contract package covering pavement construction and technical infrastructure along the route, Cai Mep \u2013 Thi Vai inter-port road project, Section 4 (Km9+612,64 -:- Km11+698,78)<\/p>\n<\/td>\n<td>\n<p>Road and Bridge Construction Division 1 \u2013 Civil Engineering Construction Corporation No. 8<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>6<\/p>\n<\/td>\n<td>\n<p>Construction quality testing for the subgrade, removal of organic soil, geotextile laying and sand filling items, Cai Mep \u2013 Thi Vai inter-port road, Section 7 (Km15+651,31 -:- Km17+272,13)<\/p>\n<\/td>\n<td>\n<p>Chien Thang Construction Co., Ltd<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>7<\/p>\n<\/td>\n<td>\n<p>Works quality testing, Cai Mep \u2013 Thi Vai inter-port road, Section 1 \u2013 construction contract package 02, item: subgrade from Km0+800 -:- Km1+300, ground treatment using cement deep soil mixing columns (full-scale construction stage)<\/p>\n<\/td>\n<td>\n<p>Chau Thanh Transport and Urban Construction JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>8<\/p>\n<\/td>\n<td>\n<p>Construction quality testing for the cement deep soil mixing column item, full-scale construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 1, construction contract package 03 (Km1+300 -:- Km1+898,03)<\/p>\n<\/td>\n<td>\n<p>Dong Nam Construction Co., Ltd<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>9<\/p>\n<\/td>\n<td>\n<p>Construction quality testing, Contract Package No. 09: construction of the stretch from Km0+00 -:- Km1+437,53, NH56 project \u2013 Ba Ria Town bypass<\/p>\n<\/td>\n<td>\n<p>Ho Chi Minh City branch of IDICO Petroleum Construction Investment JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>10<\/p>\n<\/td>\n<td>\n<p>Geotechnical survey for the BIDV headquarters building at 72A Tran Hung Dao, Vung Tau City<\/p>\n<\/td>\n<td>\n<p>BIDV Vietnam \u2013 Southern Investment Projects Works Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>11<\/p>\n<\/td>\n<td>\n<p>Construction quality testing for the subgrade item (excluding testing of cement soil columns), full-scale construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 3, construction contract package 02 (Km8+800 -:- Km1+300)<\/p>\n<\/td>\n<td>\n<p>Ba Ria \u2013 Vung Tau Transport Works JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>12<\/p>\n<\/td>\n<td>\n<p>Construction quality testing for the subgrade item (excluding testing of cement soil columns), full-scale construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 1, construction contract package 02 (Km0+800 -:- Km1+300)<\/p>\n<\/td>\n<td>\n<p>Ba Ria \u2013 Vung Tau Transport Works JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>13<\/p>\n<\/td>\n<td>\n<p>Testing during the trial construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 1 (Km0+000 -:- Km1+898,03)<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>14<\/p>\n<\/td>\n<td>\n<p>Testing during the trial construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 6<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>15<\/p>\n<\/td>\n<td>\n<p>Construction quality testing for the subgrade item (excluding testing of cement soil columns), full-scale construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 1, construction contract package 03 (Km1+300 -:- Km1+898,03)<\/p>\n<\/td>\n<td>\n<p>Dong Nam Construction Co., Ltd<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>16<\/p>\n<\/td>\n<td>\n<p>Construction quality testing for the subgrade item and for ground treatment using cement deep soil mixing columns, full-scale construction stage, Cai Mep \u2013 Thi Vai inter-port road, Section 6 (Km14+424,98 -:- Km15+561,31), construction contract package 02<\/p>\n<\/td>\n<td>\n<p>886 \u2013 Thanh Nam Construction Investment JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>17<\/p>\n<\/td>\n<td>\n<p>Quality testing on the Cai Mep \u2013 Thi Vai inter-port road, Section 3 \u2013 package 1 (Km7+199,25 -:- Km8+800), cement deep soil mixing column item, full-scale construction stage<\/p>\n<\/td>\n<td>\n<p>Airport Construction Single-Member Co., Ltd \u2013 ACC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>18<\/p>\n<\/td>\n<td>\n<p>Construction quality inspection testing, Contract Package No. 01 (Km7+199,25 -:- Km8+800), Cai Mep \u2013 Thi Vai inter-port road, Section 3 (subgrade works).<\/p>\n<\/td>\n<td>\n<p>Road and Bridge Division \u2013 Ba Ria \u2013 Vung Tau Urban Construction and Development JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>19<\/p>\n<\/td>\n<td>\n<p>Quality testing on the Cai Mep \u2013 Thi Vai inter-port road, Section 3 \u2013 package 1, cement deep soil mixing column item, trial construction stage<\/p>\n<\/td>\n<td>\n<p>Airport Construction Single-Member Co., Ltd \u2013 ACC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>20<\/p>\n<\/td>\n<td>\n<p>Construction quality inspection testing, Contract Package No. 12, oil and gas rig building and repair base<\/p>\n<\/td>\n<td>\n<p>Hung Khanh Co., Ltd<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>21<\/p>\n<\/td>\n<td>\n<p>Quality testing for the subgrade item, Cai Mep \u2013 Thi Vai inter-port road, Section 3, construction contract package 02<\/p>\n<\/td>\n<td>\n<p>Ba Ria \u2013 Vung Tau Transport Works JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>22<\/p>\n<\/td>\n<td>\n<p>Quality inspection testing of transport works, Contract Package No. 05b (Km83+400 -:- Km84+767,5), rehabilitation and upgrading of the final section of NH51<\/p>\n<\/td>\n<td>\n<p>Ba Ria \u2013 Vung Tau Transport Works JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>23<\/p>\n<\/td>\n<td>\n<p>Construction quality inspection testing, Contract Package No. 05a (Km82+030 -:- Km83+400), rehabilitation and upgrading of NH51<\/p>\n<\/td>\n<td>\n<p>Road and Bridge Division \u2013 Ba Ria \u2013 Vung Tau Urban Construction and Development JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>24<\/p>\n<\/td>\n<td>\n<p>Construction quality inspection testing, Contract Package No. 12 (Km0+00 -:- Km4+500), upgrading of the Hoi Bai \u2013 Chau Pha \u2013 Da Bac \u2013 Phuoc Tan road (phase 1)<\/p>\n<\/td>\n<td>\n<p>Road and Bridge Division \u2013 Ba Ria \u2013 Vung Tau Urban Construction and Development JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>25<\/p>\n<\/td>\n<td>\n<p>Construction quality inspection testing for the stretch Km10+471,49 -:- Km13+550,95 within Contract Package No. 14 (Km9+00 -:- Km13+550,95), upgrading of the Hoi Bai \u2013 Chau Pha \u2013 Da Bac \u2013 Phuoc Tan road (phase 1)<\/p>\n<\/td>\n<td>\n<p>Tan Thanh Construction Investment and Manufacturing JSC<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/blockquote>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The LAS-XD HCM.013 laboratory: quality testing of subgrades, pavements and structures on transport works.<\/p>\n","protected":false},"author":0,"featured_media":377,"parent":457,"menu_order":26,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-460","page","type-page","status-publish","has-post-thumbnail","hentry","description-off"],"_links":{"self":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/460","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/types\/page"}],"replies":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/comments?post=460"}],"version-history":[{"count":0,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/460\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/457"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/media\/377"}],"wp:attachment":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/media?parent=460"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}