{"id":449,"date":"2026-09-07T21:39:03","date_gmt":"2026-09-07T14:39:03","guid":{"rendered":"https:\/\/tuvangiaothong.com\/coastal-inter-port-roads\/"},"modified":"2026-10-09T20:26:38","modified_gmt":"2026-10-09T13:26:38","slug":"coastal-inter-port-roads","status":"publish","type":"page","link":"https:\/\/tuvangiaothong.com\/en\/fields-of-activity\/coastal-inter-port-roads\/","title":{"rendered":"Coastal &#038; Inter-port Roads"},"content":{"rendered":"<blockquote>\n<table>\n<tbody>\n<tr>\n<td>\n<h3>No<\/h3>\n<\/td>\n<td>\n<h3>Project Name<\/h3>\n<\/td>\n<td>\n<h3>Project Owner<\/h3>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>1<\/p>\n<\/td>\n<td>\n<p>Geotechnical survey for the technical design and cost estimate stage, and construction drawing design, Road 991B from NH51 to the downstream area of Cai Mep Port, BRIDGE SECTION<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>2<\/p>\n<\/td>\n<td>\n<p>Survey, technical design and cost estimate, and construction drawing design, Road 991B from NH51 to the downstream area of Cai Mep Port, ROAD SECTION (excluding the overpass at the NH51 interchange)<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>3<\/p>\n<\/td>\n<td>\n<p>Survey and construction drawing design, Phuoc Hoa \u2013 Cai Mep road, road section<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>4<\/p>\n<\/td>\n<td>\n<p>Survey consultancy, technical design, construction drawing design and cost estimate for the stretch from Km16+200 to Km16+380 of inter-port road section 7 (Km15+561,31-Km17+271,13)<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>5<\/p>\n<\/td>\n<td>\n<p>Survey and construction drawing design, Cai Mep \u2013 Thi Vai inter-port road, Section 8<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>6<\/p>\n<\/td>\n<td>\n<p>Survey and technical design, Cai Mep \u2013 Thi Vai inter-port road, Section 8<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>7<\/p>\n<\/td>\n<td>\n<p>Construction drawing design \u2013 coastal road from Cua Lap Bridge to Lo Voi junction, Long Dien District<\/p>\n<\/td>\n<td>\n<p>Long Dien District Construction Investment Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>8<\/p>\n<\/td>\n<td>\n<p>Survey and project preparation, Road N4 around the shore of Xuyen Moc Lake<\/p>\n<\/td>\n<td>\n<p>Xuyen Moc District Construction Investment Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>9<\/p>\n<\/td>\n<td>\n<p>Survey for the technical design stage, technical design and cost estimate, and construction drawing design, road and bridge from Go Gang to Long Son, section connecting to the Lang Cat \u2013 Long Son road<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>10<\/p>\n<\/td>\n<td>\n<p>Survey and preparation of the construction investment project for the rehabilitation and upgrading of the coastal road from Cua Lap Bridge to Lo Voi junction, Long Dien District<\/p>\n<\/td>\n<td>\n<p>Long Dien District Construction Investment Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>11<\/p>\n<\/td>\n<td>\n<p>Survey, technical design and cost estimate, Section 4 of the Cai Mep \u2013 Thi Vai inter-port road<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>12<\/p>\n<\/td>\n<td>\n<p>Survey, technical design and construction drawing design, revised road from Go Gang Island to Long Son Island (following the change of scale)<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>13<\/p>\n<\/td>\n<td>\n<p>Survey and construction drawing design for the additional 22 kV power line, transformer station and lighting system, Dung Quat \u2013 Sa Huynh coastal road, My Khe \u2013 Tra Khuc section<\/p>\n<\/td>\n<td>\n<p>Quang Ngai Provincial Department of Transport<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>14<\/p>\n<\/td>\n<td>\n<p>Survey and project preparation, road and bridge from Go Gang to Long Son, section connecting to the Lang Cat \u2013 Long Son road<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>15<\/p>\n<\/td>\n<td>\n<p>Survey, technical design and cost estimate, alignment of Section 7 of the Cai Mep \u2013 Thi Vai inter-port road (Km15+561,31 -:- Km17+271,13)<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>16<\/p>\n<\/td>\n<td>\n<p>Topographic, geotechnical and hydrological survey of Vam Gui Bridge, Cai Mep \u2013 Thi Vai inter-port road project, Section 1 (Km0+000 -:- Km1+898,03)<\/p>\n<\/td>\n<td>\n<p>Tan Phat JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>17<\/p>\n<\/td>\n<td>\n<p>Survey, technical design and cost estimate, road works of Section 6 of the Cai Mep \u2013 Thi Vai inter-port road<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>18<\/p>\n<\/td>\n<td>\n<p>Survey, technical design and cost estimate, road works of Section 1 of the Cai Mep \u2013 Thi Vai inter-port road<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>19<\/p>\n<\/td>\n<td>\n<p>Survey and construction drawing design, Section 3 (Km7+199,25 -:- Km9+612,64) of the Cai Mep \u2013 Thi Vai inter-port road project<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>20<\/p>\n<\/td>\n<td>\n<p>Survey and project preparation, Road 991B from NH51 to the downstream area of Cai Mep Port, Tan Thanh District.<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>21<\/p>\n<\/td>\n<td>\n<p>Survey and project preparation, Phuoc Hoa \u2013 Cai Mep road, Tan Thanh District<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>22<\/p>\n<\/td>\n<td>\n<p>Survey and technical design, Section 3 (Km7+199,25 -:- Km9+612,64) of the Cai Mep \u2013 Thi Vai inter-port road<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>23<\/p>\n<\/td>\n<td>\n<p>Topographic and geotechnical survey and project preparation for the alignment of the Cai Mep \u2013 Thi Vai inter-port road<\/p>\n<\/td>\n<td>\n<p>Major Bridge and Tunnel Design Consultancy JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>24<\/p>\n<\/td>\n<td>\n<p>Survey and construction drawing design, Dung Quat \u2013 Sa Huynh coastal road, My Khe \u2013 Tra Khuc section<\/p>\n<\/td>\n<td>\n<p>Quang Ngai Provincial Department of Transport<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>25<\/p>\n<\/td>\n<td>\n<p>Technical infrastructure for the residential area along the Bau Giang \u2013 Cau Moi corridor (main roads, concrete roads, pavements, landscaping, power supply and lighting systems)<\/p>\n<\/td>\n<td>\n<p>Quang Ngai Provincial Construction Investment Projects Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>26<\/p>\n<\/td>\n<td>\n<p>Survey, technical design and construction drawing design, road from Go Gang Island to Long Son Island, Long Son Commune, Vung Tau City<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>27<\/p>\n<\/td>\n<td>\n<p>Survey, technical and construction design, Vung Tau \u2013 Binh Thuan (VT \u2013 BT) coastal road, Ben Loi \u2013 Binh Chau section (70 km)<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>Road 991B, the Phuoc Hoa \u2013 Cai Mep road, the sections of the Cai Mep \u2013 Thi Vai inter-port road and the Ba Ria \u2013 Vung Tau coastal road.<\/p>\n","protected":false},"author":0,"featured_media":373,"parent":457,"menu_order":23,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-449","page","type-page","status-publish","has-post-thumbnail","hentry","description-off"],"_links":{"self":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/449","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/types\/page"}],"replies":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/comments?post=449"}],"version-history":[{"count":0,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/449\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/457"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/media\/373"}],"wp:attachment":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/media?parent=449"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}