{"id":448,"date":"2026-09-07T21:39:03","date_gmt":"2026-09-07T14:39:03","guid":{"rendered":"https:\/\/tuvangiaothong.com\/expressways-national-highways\/"},"modified":"2026-10-09T20:26:37","modified_gmt":"2026-10-09T13:26:37","slug":"expressways-national-highways","status":"publish","type":"page","link":"https:\/\/tuvangiaothong.com\/en\/fields-of-activity\/expressways-national-highways\/","title":{"rendered":"Expressways &#038; National Highways"},"content":{"rendered":"<blockquote>\n<table>\n<tbody>\n<tr>\n<td>\n<h3>No<\/h3>\n<\/td>\n<td>\n<h3>Project Name<\/h3>\n<\/td>\n<td>\n<h3>Project Owner<\/h3>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>1<\/p>\n<\/td>\n<td>\n<p>Survey and design consultancy for the Ho Tram \u2013 Long Thanh International Airport urban expressway project under the public-private partnership (PPP) model<\/p>\n<\/td>\n<td>\n<p>Masterise Long Thanh \u2013 Ho Tram Expressway Infrastructure JSC (MAG)<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>2<\/p>\n<\/td>\n<td>\n<p>Technical design consultancy for Km85+160-Km97+891 under the construction investment project to widen the Ho Chi Minh City \u2013 Trung Luong \u2013 My Thuan Expressway under the public-private partnership model<\/p>\n<\/td>\n<td>\n<p>A2Z Construction Consultancy JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>3<\/p>\n<\/td>\n<td>\n<p>Survey, construction drawing design and building information modelling (BIM) consultancy, segment Km85+160 \u2013 Km92+370, Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City \u2013 Trung Luong \u2013 My Thuan Expressway under the public-private partnership model<\/p>\n<\/td>\n<td>\n<p>Thanh Huy Group JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>4<\/p>\n<\/td>\n<td>\n<p>Survey, construction drawing design and building information modelling (BIM) consultancy, segment XL04 \u2013 Km92+370 \u2013 Km97+891,44 (including bridges), Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City \u2013 Trung Luong \u2013 My Thuan Expressway under the public-private partnership model<\/p>\n<\/td>\n<td>\n<p>CII Infrastructure Construction JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>5<\/p>\n<\/td>\n<td>\n<p>Survey, construction drawing design and building information modelling (BIM) consultancy, segment XL04 \u2013 Km97+891,44 \u2013 105 +454 (including bridges), Contract Package XL-04: survey, construction drawing design and construction of the Km85+160-Km105+454 stretch (including bridges), construction investment project to widen the Ho Chi Minh City \u2013 Trung Luong \u2013 My Thuan Expressway under the public-private partnership model<\/p>\n<\/td>\n<td>\n<p>Thang Long Corporation \u2013 JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>6<\/p>\n<\/td>\n<td>\n<p>Survey consultancy, preparation of the construction investment feasibility study report, environmental impact assessment and building information modelling (BIM), project DATP2-1: construction of the expressway section from the Toc Tien \u2013 Chau Pha intersection to Chau Duc Bridge (including Chau Duc Bridge at the boundary with Dong Nai Province), Ho Chi Minh City Ring Road 4 construction investment project<\/p>\n<\/td>\n<td>\n<p>Ba Ria \u2013 Vung Tau Provincial Regional Transport and Agricultural Projects Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>7<\/p>\n<\/td>\n<td>\n<p>Survey consultancy, technical design and cost estimate, construction drawing design and BIM management model, project: road connecting to the Bien Hoa \u2013 Vung Tau Expressway (from Vung Van interchange to the PR.994 coastal road)<\/p>\n<\/td>\n<td>\n<p>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>8<\/p>\n<\/td>\n<td>\n<p>Survey consultancy, preparation of the technical design and cost estimate documents and construction drawing design, Component Project 3 of the Bien Hoa \u2013 Vung Tau Expressway construction investment project, phase 1<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Port Area Transport Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>9<\/p>\n<\/td>\n<td>\n<p>Survey consultancy and preparation of the pre-feasibility study report, Ba Ria \u2013 Vung Tau Main Road project (expressway connector from Vung Van roundabout on NH55 to Cua Lap roundabout on NH51B)<\/p>\n<\/td>\n<td>\n<p>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>10<\/p>\n<\/td>\n<td>\n<p>Survey consultancy and preparation of the feasibility study report (including BIM), Vung Tau Main Road project (section from the Vung Tau \u2013 Binh Thuan coastal road interchange (PR.994) to the Road 51B, C roundabout interchange, Vung Tau City)<\/p>\n<\/td>\n<td>\n<p>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>11<\/p>\n<\/td>\n<td>\n<p>Survey consultancy and preparation of the feasibility study report (including BIM), project: road connecting to the Bien Hoa \u2013 Vung Tau Expressway (from Vung Van interchange to the PR.994 coastal road)<\/p>\n<\/td>\n<td>\n<p>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>12<\/p>\n<\/td>\n<td>\n<p>Bien Hoa \u2013 Vung Tau Expressway \u2013 Component Project 3, phase 1<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>13<\/p>\n<\/td>\n<td>\n<p>Survey, technical design and cost estimate (excluding the ITS system), design and staking out of the site clearance and right-of-way boundary markers for Km68+340 -:- Km99+000, Phan Thiet \u2013 Dau Giay construction investment component project, under the project for construction investment in several sections of the Eastern North \u2013 South Expressway, 2017-2020 phase<\/p>\n<\/td>\n<td>\n<p>Thang Long Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>14<\/p>\n<\/td>\n<td>\n<p>Survey, technical design and cost estimate, staking out of the site clearance and right-of-way boundary markers for Km134-Km168, Vinh Hao \u2013 Phan Thiet construction investment component project, under the Vinh Hao \u2013 Phan Thiet section investment project of the project for investment in several sections of the Eastern North \u2013 South Expressway, 2017-2020 phase<\/p>\n<\/td>\n<td>\n<p>Project Management Unit 7<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>15<\/p>\n<\/td>\n<td>\n<p>Construction investment project for the Trung Luong \u2013 My Thuan Expressway, phase 1, under a BOT contract, Contract Package XL13 for Km76+934.28 -:- Km78+956.007; XL14 for the stretch Km78+956.007 -:- Km81+871.870<\/p>\n<\/td>\n<td>\n<p>Trung Luong \u2013 My Thuan BOT Company<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>16<\/p>\n<\/td>\n<td>\n<p>Technical survey, Component Project 3, NH5 section: Ha Noi \u2013 Hai Duong (Km43+900 \u2013 Km93+00) \u2013 VRAM<\/p>\n<\/td>\n<td>\n<p>Project Management Unit 3 \u2013 Directorate for Roads of Vietnam<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>17<\/p>\n<\/td>\n<td>\n<p>Technical survey, Component Project 3, NH6 section: Hoa Binh \u2013 Son La (Km78+300 \u2013 Km303+000) \u2013 VRAM<\/p>\n<\/td>\n<td>\n<p>Project Management Unit 3 \u2013 Directorate for Roads of Vietnam<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>18<\/p>\n<\/td>\n<td>\n<p>Technical survey, Component Project 3, NH38 section: Quan Goi \u2013 Yen Lenh (Km33+130 \u2013 Km52+827) \u2013 VRAM<\/p>\n<\/td>\n<td>\n<p>Project Management Unit 3 \u2013 Directorate for Roads of Vietnam<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>19<\/p>\n<\/td>\n<td>\n<p>Technical survey, Component Project 3, NH39-1 section: Trieu Duong \u2013 Hung Ha (Km42+714 \u2013 Km64+000) \u2013 VRAM<\/p>\n<\/td>\n<td>\n<p>Project Management Unit 3 \u2013 Directorate for Roads of Vietnam<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>20<\/p>\n<\/td>\n<td>\n<p>Technical survey, Component Project 3, NH48 section \u2013 Nghe An Province (Km 00 \u2013 Km 20 + Km 38 \u2013 Km 64) \u2013 VRAM<\/p>\n<\/td>\n<td>\n<p>Project Management Unit 3 \u2013 Directorate for Roads of Vietnam<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>21<\/p>\n<\/td>\n<td>\n<p>Preparation of construction investment projects for the Year 4 component projects \u2013 Road network maintenance component \u2013 WB4 Project<\/p>\n<\/td>\n<td>\n<p>Project Management Unit 2 \u2013 Vietnam Road Administration<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>22<\/p>\n<\/td>\n<td>\n<p>Survey and design consultancy, NH56 project \u2013 Ba Ria Town bypass<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>23<\/p>\n<\/td>\n<td>\n<p>Survey and design consultancy, Ba Ria Town bypass project \u2013 NH56, Ba Ria \u2013 Vung Tau Province.<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>24<\/p>\n<\/td>\n<td>\n<p>Survey and investigation for Year 3.2 of the programme (topographic, hydrological, geotechnical, pavement and traffic volume surveys, plus support and study of related engineering issues)<\/p>\n<\/td>\n<td>\n<p>Egis Bceom International<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>25<\/p>\n<\/td>\n<td>\n<p>Survey consultancy and preparation of the design documents, NH55 bypass through An Nhut Commune, Long Dien District and Dat Do Township, Dat Do District<\/p>\n<\/td>\n<td>\n<p>Ba Ria \u2013 Vung Tau Provincial Specialised Transport Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>26<\/p>\n<\/td>\n<td>\n<p>Survey consultancy, preparation of the construction drawing design and cost estimate: road from NH12C to the Formosa integrated steel complex, Ha Tinh Province<\/p>\n<\/td>\n<td>\n<p>Ha Tinh Provincial Economic Zone Construction Investment Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>27<\/p>\n<\/td>\n<td>\n<p>Survey and design consultancy for the widening of NH51 through Ba Ria \u2013 Vung Tau Province<\/p>\n<\/td>\n<td>\n<p>Bien Hoa \u2013 Vung Tau Expressway Development JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>28<\/p>\n<\/td>\n<td>\n<p>Survey and design, project for the upgrading and widening of NH55 through Ba Ria \u2013 Vung Tau Province<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>29<\/p>\n<\/td>\n<td>\n<p>Survey and design, final section of NH51 (NH51B route)<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>30<\/p>\n<\/td>\n<td>\n<p>Survey and design, project for the upgrading and widening of NH56 through Ba Ria \u2013 Vung Tau Province<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>31<\/p>\n<\/td>\n<td>\n<p>NH14 western bypass road, Buon Ma Thuot City<\/p>\n<\/td>\n<td>\n<p>Buon Ma Thuot City Projects Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>32<\/p>\n<\/td>\n<td>\n<p>Eastern North \u2013 South Expressway, 2017-2020 phase, Vinh Hao \u2013 Phan Thiet section<\/p>\n<\/td>\n<td>\n<p>Project Management Unit 7<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>33<\/p>\n<\/td>\n<td>\n<p>Eastern North \u2013 South Expressway, 2017-2020 phase, Phan Thiet \u2013 Dau Giay section<\/p>\n<\/td>\n<td>\n<p>Thang Long Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>34<\/p>\n<\/td>\n<td>\n<p>Survey and design of the Trung Luong \u2013 My Thuan Expressway (BOT project)<\/p>\n<\/td>\n<td>\n<p>TEDI \u2013 Transport Engineering Design Incorporated, JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>35<\/p>\n<\/td>\n<td>\n<p>Survey and technical design with cost estimate, NH56 \u2013 Ba Ria Town bypass<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>36<\/p>\n<\/td>\n<td>\n<p>NH55 bypass through An Ngai Commune (project)<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit II<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>37<\/p>\n<\/td>\n<td>\n<p>Final section of NH51<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>38<\/p>\n<\/td>\n<td>\n<p>Survey and detailed planning design of the interchanges and service roads on NH56<\/p>\n<\/td>\n<td>\n<p>Ba Ria \u2013 Vung Tau Provincial Department of Transport<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>39<\/p>\n<\/td>\n<td>\n<p>Survey and preparation of the construction investment project for the Ba Ria Town bypass \u2013 NH56, Ba Ria \u2013 Vung Tau Province.<\/p>\n<\/td>\n<td>\n<p>Cai Mep \u2013 Thi Vai Inter-port Road Project Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>40<\/p>\n<\/td>\n<td>\n<p>Topographic and geotechnical survey and preparation of the construction drawing design and cost estimate, Contract Package TV-08, widening of NH51 (km47-Km56)<\/p>\n<\/td>\n<td>\n<p>Bien Hoa \u2013 Vung Tau Expressway Development JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>41<\/p>\n<\/td>\n<td>\n<p>NH14 western bypass road, Buon Ma Thuot City, Contract Package No. 03 (2007 scheme)<\/p>\n<\/td>\n<td>\n<p>Buon Ma Thuot City Projects Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>42<\/p>\n<\/td>\n<td>\n<p>NH14 western bypass road, Buon Ma Thuot City, Contract Package No. 04 (2007 scheme)<\/p>\n<\/td>\n<td>\n<p>Buon Ma Thuot City Projects Management Unit<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>43<\/p>\n<\/td>\n<td>\n<p>Survey and construction drawing design, upgrading and widening of NH55 (Contract Package No. 1 \u2013 Km45+850 -:- Km52+305)<\/p>\n<\/td>\n<td>\n<p>Ba Ria \u2013 Vung Tau Transport Works JSC<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>44<\/p>\n<\/td>\n<td>\n<p>Rehabilitation and upgrading of NH56 through Ba Ria \u2013 Vung Tau Province (Contract Package 1: Km18+020 -:- Km23+600)<\/p>\n<\/td>\n<td>\n<p>Transport Works Company 875<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>45<\/p>\n<\/td>\n<td>\n<p>Survey and construction drawing design, Contract Package No. 5 on NH55 (Dai Bridge, Trong Bridge, Nhan 1 Culvert, Nhan 2 Culvert, Suoi Da)<\/p>\n<\/td>\n<td>\n<p>Huong Giang JSC \u2013 Ministry of National Defence<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>46<\/p>\n<\/td>\n<td>\n<p>Construction drawing design, final section of NH51 (former NH51B route), Contract Package No. 01<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>47<\/p>\n<\/td>\n<td>\n<p>Survey and technical design, NH55, Lang Dai \u2013 Binh Thuan section<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>48<\/p>\n<\/td>\n<td>\n<p>Construction drawing design for the upgrading of NH51B (Contract Package No. 3)<\/p>\n<\/td>\n<td>\n<p>Dong Tam Co., Ltd<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>49<\/p>\n<\/td>\n<td>\n<p>Survey and technical design, NH56 (later section: Km18+020 -:- Km50+457)<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>50<\/p>\n<\/td>\n<td>\n<p>Survey and project preparation, NH55, Lang Dai \u2013 Binh Thuan section<\/p>\n<\/td>\n<td>\n<p>Transport Project Management Unit I<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>The Eastern North \u2013 South Expressway (Vinh Hao \u2013 Phan Thiet, Phan Thiet \u2013 Dau Giay), the Trung Luong \u2013 My Thuan Expressway and National Highways NH5, NH51, NH55 and NH56.<\/p>\n","protected":false},"author":0,"featured_media":382,"parent":457,"menu_order":21,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-448","page","type-page","status-publish","has-post-thumbnail","hentry","description-off"],"_links":{"self":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/types\/page"}],"replies":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/comments?post=448"}],"version-history":[{"count":0,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/448\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/pages\/457"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/media\/382"}],"wp:attachment":[{"href":"https:\/\/tuvangiaothong.com\/en\/wp-json\/wp\/v2\/media?parent=448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}